29/10/2026
We recently completed a comprehensive top-end overhaul of Scania S450 V8 engine and generator overhaul for a local airport, where reliable power generation is essential for emergency runway lighting.
To ensure uninterrupted operation throughout the project, we arranged the hire of a temporary backup generator, which our engineers installed on-site while the Scania engine was removed and overhauled at our workshops.
Following completion of the overhaul, the generator underwent thorough testing to verify its performance and reliability before being reinstalled and returned to service.
For all enquires contact our team:
☎️ Tel: 01928 566 170
📧 [email protected]
🖥️ www.jamestroop.co.u
📍 4 Davy Road, Astmoor Industrial Estate, Runcorn, Cheshire, WA7 1PZ
📍 Unit 9, New Clee Industrial Estate, Spencer Street, Grimsby, DN31 3AA