Clarke Contractors

Clarke Contractors Clarke Contractors are Specilists in the installation and servicing of Wastewater Tank Treatment Systems throughout North Wales and the North West.

We are an approved installer for Graf Wastewater Treatment Systems.

Recent project in the Erbistock Village. Separating two properties from One tank and giving both properties a 7PE system...
29/05/2026

Recent project in the Erbistock Village. Separating two properties from One tank and giving both properties a 7PE system each, and then discharging into a shared drainage field, in an area of field down stream of the properties. Other quotes were aiming at keeping them on a shared system. When we costed our solution we were £1,000.00 Higher on the install costs, but as I explained to both property owners - Shared systems have their hidden legal costs, and they can also be mis loaded by one of the users.

Both clients very Happy with the Install, and should they look to sell their properties in the future, we have removed a little headache from the transaction.

Graf Septic Tank Install under a clients drive in Trofarth, Abergele. Really hard digging on this project which added a ...
22/05/2026

Graf Septic Tank Install under a clients drive in Trofarth, Abergele. Really hard digging on this project which added a few days to the project. D400 access lid as Client had His and Hers Tesla's and we didn't want to gamble with the Graf Composite vehicle lids.

Due to the depth of the invert level, we really wanted to bring it backup to the existing foul line to keep costs down.

Clint very happy = Council very happy = Clarke Contractors very happy

We fitted this 7PE One to Clean Treatment Plant in March 2026 in Abergele, and are very proud of how well the system and...
21/05/2026

We fitted this 7PE One to Clean Treatment Plant in March 2026 in Abergele, and are very proud of how well the system and its surroundings have grown back. This is not Turf, this is the results of the ground care from both our install team and the homeowner. When the Green lid is in place you would hardly know it is there.

Graf systems have the following benefits:

*Low running costs on power demand: £60.00 Per annum - Demands power 10hrs a day. (Unlike others that are 24hrs)
*Low cost replacement Parts
*100% recycled Plastics
*Low visual impact.
*High Quality PIA discharge
*limited requirement for concrete back fill (Ground conditions determine back fill)
* Audio Alarms for if issues arise
*German engineering
*Great customer support

If we are asked what is our recommended system we will always say Graf - However, we are competent in the installations of all systems distributed in the UK.

Don't be fooled by the Cheap quotations - If it goes wrong then it becomes an extremely expensive replacement.

With restricted space and access, water separation requirements, this project proved a little difficult when pricing.Onc...
19/05/2026

With restricted space and access, water separation requirements, this project proved a little difficult when pricing.

Once again the team dealt with all issues professionally.

Shed was winched out, 5PE Graf Tank installed, patio re-laid. Installation completed 2 days ahead of schedule. Discount given to the client for the project over all.

Happy Customer + happy team + happy environment + happy Council = Happy Clarke Contractors!!

We are always delighted to receive client feedback, whether it be an On-line a review or just a simple e-mail. Maintaini...
27/04/2026

We are always delighted to receive client feedback, whether it be an On-line a review or just a simple e-mail.

Maintaining the high standards set from the outset is the biggest challenge, especially when you get into busier periods. Our teams do not falter or fail ever. For this alone, we are very proud to be consistently rewarded with positive feedback from our clients.

*** WE ARE HIRING***We are looking to add a groundworker to our work force for upcoming projects. Applicant must have pr...
13/04/2026

*** WE ARE HIRING***

We are looking to add a groundworker to our work force for upcoming projects.

Applicant must have proven groundwork experience, some drainage knowledge, and a full driving license.
7.30am From our Ruthin office till 4.30pm on site. 5 days a week.

Work will be predominately installing Septic tanks, treatment Tanks, mains connections, and other domestic drainage works.
Pay is negotiable depending on experience and will be discussed at interview.

To apply, please send an e-mail to [email protected]

or call 01824 790 737 to arrange an interview.

Clarke Contractors were a proud sponsor of a recent 'Riot in the Ring' fight night, that was brought about to raise awar...
24/03/2026

Clarke Contractors were a proud sponsor of a recent 'Riot in the Ring' fight night, that was brought about to raise awareness for Men's Mental Health. Clarke Contractors sponsored the main even where Dale McGuire V Mark Peacock were fighting in Memory of Jordan Eccles, a young man who lost his life far too soon, and where Dale had raised a staggering amount of money to gift to local Metal Health Charities. Dale went on to get the win. A very successful night and we were proud to be apart of it. What a great show.

Remember, speak out, don't suffer in silence there's always a listening ear not far away.

Pictures: Patrick Kavanagh getting his hand raised

Martin Lambert getting ready

The Clarke Contractors trophy.

Clarke Contractors Dave, getting the Mindfight team warmed up.

Queens Market, Rhyl. Riot in the Ring

Some of our recent projects:Drian Repairs, Pump Station installs, Drainage fields, Septic Tank and treatment Tank. 2026 ...
06/03/2026

Some of our recent projects:

Drian Repairs, Pump Station installs, Drainage fields, Septic Tank and treatment Tank. 2026 has had a busy first quarter, second quarter looks equally as busy, but hopefully we will have the sunshine on our site teams backs. They're solar powered and work faster and better in the dry.

Well done team, keep up the sterling work.

We continue to receive 5* reviews - This consistency is purely down to the team and their continued efforts on Site.Qual...
23/02/2026

We continue to receive 5* reviews - This consistency is purely down to the team and their continued efforts on Site.

Quality counts for everything!

Well done all!!

26/01/2026

***Employment Opportunity*** POSITION NOW FILLED***

We are seeking a Groundworker to join our team.

Preferred experience in Septic and Treatment Tank installation, but not essential.

Proven knowledge of domestic drainage works and Installations, and other groundwork experience required.

Driving License Essential

Hourly pay between £16.00 -£18.00 depending on experience.

Start at our Offices in Ruthin 7.30am - Finish on site 4.30pm

Please call: 01824 790737
or e-mail: [email protected]

Address

Cae Bricks
Ruthin
LL152TN

Alerts

Be the first to know and let us send you an email when Clarke Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Clarke Contractors:

Share