04/01/2022
Some photos of some work in the main house at the grainary HarwoodDale from November time. This was the lounge, dinning area. All ceilings and stud work had been boarded. I just had to do some dot and dab boarding, some prep work, then bead and scrim tape and plaster it all. Every set was always a 2 coat set with a fresh mix for the second coat as always as thats the right way to do and to get the best results on the final finish 👷♂️👌