18/01/2026
Big job from the summer in the heat š„µ
It was a hard slog, but itās always rewarding when itās completed.
The render was fully removed as it was shot and hollow to the tap. Brickwork pvaād before walls were boarded.
A new stud wall was erected, and both rooms had ceilings overboarded and walls dot and dabbed, then both rooms fully skimmed.