15/10/2024
It's been extremely Busy over the last couple of Days with Breakdowns as well as continuing our Install at Whitley Hall Hotel.
We have removed 2 x 260kw Powrmatic Gas Fired Warm Air Heaters at a Commercial Unit in Leeds, Servicing a Boiler in Chesterfield. Carrying on the Install at Whitley Hall Hotel. Then Last night fitting parts on the 3 out of 4 A O Smith Cyclone Gas Fired Water Heaters. All 3 needs HSI's 1 needed a Detection Electrode and the Last needed a New PCB Control Board.
Today we started at Wincobank School fitting a Combustion Fan on an Commercial ARAG Boiler that had failed last week. Then onto Servicing a Navien Boiler we fitted 4 years ago. Then to SOAR Works to get there Heating back on after the Site didn't have any. We found that the Pressurisation Unit had blown the Fuse. So we replaced this and Tested it. Which got it working. So then we Serviced the Hamworthy Wessex Modumax 160. Then back to Whitley Hall Hotel.
Lastly to a Callout to a Worcester Bosch Greenstar Junior Boiler that had an Ignition Lockout Fault. Once we stripped it down. We found that the Seal & Electrodes were in very poor Condition. So we will pick these up and fit them tomorrow.
For all your Gas, Plumbing, Heating, Boilers, Air-conditioning, Heatpump, Refrigeration, HVAC, Process Heating, Biomass Boilers, Renewables & Ventilation. Don't hesitate to contact us.