Beaver Bridge Hire

Beaver Bridge Hire Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Beaver Bridge Hire, Construction Company, The Warehouse, Shrewsbury.

Imagine a wind farm in a remote location with access issues.These projects demand sturdy, reliable infrastructure to con...
02/05/2024

Imagine a wind farm in a remote location with access issues.

These projects demand sturdy, reliable infrastructure to connect energy sources to the grid. But what about access issues in these remote areas?

SSE Renewables approached Beaver Bridge Hire Ltd in the trust we could support them with temporary access due to restrictions at the Stronelairg Wind Farm in Fort Augustus.

To accommodate this request Beaver Bridge Hire Ltd installed a Heavy Duty Bridge to maintain the vehicle access required for SSE. Already being in-situ for 9 months, a recent visit confirmed the bridge continues to provide faultless performance for their temporary access.

Our Heavy Duty Vehicle Bridges can be assembled in multiple variations to allow 196Tonne of load capacity (LM3, SV196).

To discuss your projects needs today, please reach out via
E: [email protected]
T: 01743 811 812




Temporary bridging Tuesday 🌉 Beaver Bridge Hire has great pleasure introducing the new 11m x 6m Beaver Crossing Unit to ...
16/04/2024

Temporary bridging Tuesday 🌉

Beaver Bridge Hire has great pleasure introducing the new 11m x 6m Beaver Crossing Unit to accommodate the Newport BESS project for Clarke Enegry.

Clarke Energy have a highly desirable scope to deliver this project, while having the challenges to accommodate these works under a (TPO’s) Tree Protection order.

Beaver Bridge Hire Ltd's team delivered a full turnkey proposal with the installation of this bridge over night, over spanning the tree roots under a (TPO) to allow Clarke Energy to continue the development of the BESS project.

Our newly manufactured (BCU) Beaver Crossing Unit can be assembled in four configurations to allow 80Tonne of load capacity (SV80).

1) 11m x 1.5m
2) 11m x 3m
3) 11m x 4.5m
4) 11m x 6m

This modular BCU is a great bridge to overcome any difficulties you may experience in the delivery of your project, may that be renewables, construction, telecoms , gas/water works and much much more.

To discuss your projects needs today, please reach out via
E: [email protected]
T: 01743 811 812

01/02/2024
02/01/2024
HAPPY NEW YEAR 🎇 2️⃣0️⃣2️⃣4️⃣Concept to Completion!As we start 2024, we wanted to reflect on what an amazing year of bus...
02/01/2024

HAPPY NEW YEAR 🎇 2️⃣0️⃣2️⃣4️⃣

Concept to Completion!

As we start 2024, we wanted to reflect on what an amazing year of business we had here at Beaver Bridge Hire in 2023, it wouldn't be possible without a great team, supply chain and excellent clients. We thank you all, with fantastic achievements accomplished with plenty more to come.

Quality🔴Pace🔴Together

"Those who say in cannot be done, should not interrupt those doing it"




Address

The Warehouse
Shrewsbury
SY13TB

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Beaver Bridge Hire posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share