02/05/2024
Imagine a wind farm in a remote location with access issues.
These projects demand sturdy, reliable infrastructure to connect energy sources to the grid. But what about access issues in these remote areas?
SSE Renewables approached Beaver Bridge Hire Ltd in the trust we could support them with temporary access due to restrictions at the Stronelairg Wind Farm in Fort Augustus.
To accommodate this request Beaver Bridge Hire Ltd installed a Heavy Duty Bridge to maintain the vehicle access required for SSE. Already being in-situ for 9 months, a recent visit confirmed the bridge continues to provide faultless performance for their temporary access.
Our Heavy Duty Vehicle Bridges can be assembled in multiple variations to allow 196Tonne of load capacity (LM3, SV196).
To discuss your projects needs today, please reach out via
E: [email protected]
T: 01743 811 812