12/03/2025
Electrical Installation completed in Rugby for Legacy Projects
This Electrical installation project over 3 weeks included,
Three testing labs for specialised Electrical equipment, LED linear lighting mounted on surface conduit Metal ceilings, all the power in laboratories protected by an E Stop system for safety. Command sockets installed for specialised equipment, Distribution board with built in shunt trip for E Stop system. CAT 6A installation for IT infrastructure.