15/03/2026

Day 17 and 18 of the Disbury project. bespoke under stairs storage with shaker doors was started,along with coving installation in both downstairs living rooms soon to have LED lights around the perimeter, along with the herringbone LVT flooring, which is running through the downstairs as one continuous seamless floor.

04/03/2026

Day 15 and 16 at the Disbury renovation project. All the boarding and skimming is completed along with the tiling in the downstairs toilet and soil pipe core drilled and installed into the stack. Then the second fix joinery began, custom made window cills and stringer skirting detail and skirting boards going on.

25/02/2026

Day 13 and 14 on the Disbury renovation project. After boarding and insulating the floor the matting and underfloor heating was installed tested and then screeded ready for downstairs WC to go in next.

25/02/2026

Day 12 at the Disbury renovation project, downstairs toilet boarded, landing skimmed and that’s upstairs all plastered, with the rest of the floor down and massive clean and all downstairs cleared ready for the underfloor heating to be installed tomorrow.

23/02/2026

Day 11 at the Disbury renovation project. The rest of the floor came up and the last of the insulation was finally completed. The bathroom stud was also built and all first fix plumbing in ready for boarding. Bring on day 12

12/02/2026

Day 10 at the Disbury renovation project. All the insulation finished in the utility and the living room and taped up and airtight. Then on with the new sub floor, as plastering continues upstairs finishing the box room and prepping the hall and landing.

11/02/2026

Day 9 at the Disbury renovation project. Plastering continues upstairs as the floor continues to come up downstairs, all boards up nails out and insulation in. One room closer to underfloor heating.

10/02/2026

Day 8 at the Disbury renovation project, skip exchange first thing and rest of the master bedroom skimmed. Then downstairs started in the kitchen removing the subfloor to then begin insulating and new t&g going down, ready for underfloor heating installation.

09/02/2026

Day 7 at the Disbury project. Skimming has started in the master bedroom. Boarding continued downstairs and new WC window was delivered and fitted ready to seal up tomorrow.

08/02/2026

Day 6 at the Disbury renovation project. The boarding and rest of the plastering prep is well underway ready to start skimming tomorrow upstairs while the boarding continues downstairs.