03/06/2026
Conservatory finished over in Thelwall. Customer is elderly and has reduced mobility, so we added 35mm of self leveller to the concrete base to bring the tiles in line with the threshold of the door for easier exiting of the room. Underfloor heating throughout and 600 x 600 tiles. Materilas supplied by . Nice easy room finished before a much needed week off work with the family.