Allwood Buildings Ltd

Allwood Buildings Ltd With over 30 years’ experience in the design, manufacture and erection of timber frame buildings.

The first of a pair of pre-fabricated glulam feature trusses is almost ready to leave our factory, and it really does lo...
29/03/2022

The first of a pair of pre-fabricated glulam feature trusses is almost ready to leave our factory, and it really does look nice.
In a time when most of our projects have cranked steel frames hidden between the rafters, it has been a pleasure to create this structural visual frame.
Our loose rafters are also piling up ready for delivery, with birdsmouth and rafters end pre-cut.

Since completing our works back in 2019, Belmont Hut Community Centre in Exeter has certainly blended in to Belmont Park...
22/02/2022

Since completing our works back in 2019, Belmont Hut Community Centre in Exeter has certainly blended in to Belmont Park beautifully. It is clearly a vast improvement on the old prefab structure it replaced.

After what feels like a long-wet winter, it's certainly worth a look at these beautifully finished chalet's set back fro...
14/02/2022

After what feels like a long-wet winter, it's certainly worth a look at these beautifully finished chalet's set back from the lovely beach at Gwithian, Cornwall.
The finish both inside and out looks fantastic - colourful enough to brighten up any day.
We feel privileged to have been a part of this project, so take this opportunity to thank P Chapman Construction for making us a part of the team.

The lower level of this impressive house was constructed using traditional building methods, with our first floor timber...
08/02/2022

The lower level of this impressive house was constructed using traditional building methods, with our first floor timber frame supported off a transfer slab.
The entire structure is highly insulated, with our external wall panels constructed using 235mm wide timbers.
We worked closely with the architect to ensure our frame was detailed to suit their needs, with downpipes concealed within the walls leaving a clean uncompromised external finish.

Over the years we have constructed many classroom buildings, of varying sizes.It's always nice to see the finished build...
01/02/2022

Over the years we have constructed many classroom buildings, of varying sizes.
It's always nice to see the finished buildings, and hear what a huge difference it has made to the village school of Landford.

Tucked away just off the sea front is Estuary Reach, new apartments with a contemporary finish.They can be difficult to ...
25/01/2022

Tucked away just off the sea front is Estuary Reach, new apartments with a contemporary finish.
They can be difficult to see until you are right in front of them, down Exmouth's narrow streets.
The finish looks great, and the views from the upper level terrace are fantastic.

Exeter's exclusive student accommodation, 'The Neighbourhood' looks great projecting over the corner of Mary Arches Stre...
18/01/2022

Exeter's exclusive student accommodation, 'The Neighbourhood' looks great projecting over the corner of Mary Arches Street in the heart of Exeter.
The external finish looks great, but also the inside is also completed to the high standard you would expect in the centre of this thriving city.

After so many wet days on site, here is our erector happy in his work at the end of a stunning day in the Roedean area o...
13/01/2022

After so many wet days on site, here is our erector happy in his work at the end of a stunning day in the Roedean area of Brighton.
Clear blue skies, sun is shining and the frame for this high spec house is looking great.

Every now and again we have the pleasure of working on something a little different, the finished product of this timber...
11/01/2022

Every now and again we have the pleasure of working on something a little different, the finished product of this timber and steel frame structure really does look fantastic.
With views over the Teign estuary, the cantilevered first floor could not be better situated.

It's great to see finished photos of this large housing development, recently completed in Horsham, West Sussex.The site...
13/12/2021

It's great to see finished photos of this large housing development, recently completed in Horsham, West Sussex.
The site contained 40 houses of varying designs, with very few repeat units, but with the right design team on the project we were able to meet our clients needs and timescales.

The logistics of supplying and erecting the Harbour Beach Club Hotel at South Sands, Salcombe was always going to be a c...
07/12/2021

The logistics of supplying and erecting the Harbour Beach Club Hotel at South Sands, Salcombe was always going to be a challenge.
Although the view from the rooms is obviously beautiful, you cannot ignore the amazing finish of the building itself. The finished product really makes all the hard work worthwhile. From our initial structural design proposal, through to site er****on of our timber frame this is a project to be proud.
A big thank you goes out to all who helped us design and construct our package, through what was a difficult year for the whole country.

Address

Talewater Works
Talaton
EX52RT

Opening Hours

Monday 8:30am - 5:30pm
Tuesday 8:30am - 5:30pm
Wednesday 8:30am - 5:30pm
Thursday 8:30am - 5:30pm
Friday 8:30am - 4pm

Telephone

+441404850977

Alerts

Be the first to know and let us send you an email when Allwood Buildings Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Allwood Buildings Ltd:

Share