12/10/2022
Phase 2 with a annex and utility room extension.
With two old wells to fill and bridge over with reinforced concrete footings.
L bars for a retaining wall along roadside and path with a tanking system (red wall) for waterproofing.
Water pipe installed along with rain water and foul drains. New oil line installed under the floor and ductings for electric.
Still using traditional lime mortar and reclaimed bricks ready for roof to be pitched.
For all groundworkβs and building works Call Henry 07775884410