06/11/2026
PROGRESS UPDATE - Norwich
This project is progressing nicely through a lot of the remaining substructure and groundworks, as well as the structural steelwork.
The blockwork was laid up to DPC including lintel bridges over the foul drainage and the floor slab was prepped and poured. We have now moved onto the brickwork to DPC and the rainwater drainage pipework and harvesting tank.
Alongside our on-site progress we continue to finalise future elements of the project with coordination between design, construction and the client. These elements include the windows, external doors, standing seam metal cladding, and lighting design.
| | |