27/02/2026
Here’s some before and after shots of a massive bathroom renovation recently completed.
This one was taken right back to brick and joists — full strip out, floors up, pipework exposed and redesigned from scratch.
The boiler was removed and relocated once the new walls were built, allowing for a much cleaner layout and better use of space. All pipework was re-run, new stud walls formed with recessed shelving, and the room completely reconfigured to maximise what is a tight space.
Finished with a back to the wall WC, freestanding bath, modern vanity unit, chrome towel rail And a large shower enclosure — giving it that clean, high-end feel.
From an old outdated bathroom to a sleek, modern bathroom built to last.
If you’re thinking about upgrading your bathroom this year, get in touch — happy to discuss ideas and provide a free quote.
All Tiling and Electrical work was carried out separately.
— KC HEAT 🔥
[email protected]
07494 521565
⭐️⭐️⭐️⭐️⭐️