28/08/2026
Landfill capacity is tightening. EfW capacity is under pressure. And waste operators across the UK are facing fewer options for residual waste.
Recent reports of landfill sites reaching capacity in the North of England have reportedly removed at least one million tonnes of capacity from the market. In Scotland, waste handlers are facing their own capacity pressures, with both landfill and EfW routes under strain.
But this isn't simply a question of building more capacity.
It's about making better use of the capacity we already have, and creating more flexibility in what happens to residual waste.
Reducing mass. Stabilising organic material. Separating recoverable fractions. Preparing waste for more appropriate downstream routes.
When capacity is constrained, changing the material itself can create more options.
We've explored what the current capacity crisis means for the UK's waste infrastructure, and why a more resilient approach to residual waste is needed.
Read the full blog: The UK’s waste capacity crisis is no longer a future problem
https://advetec.com/blog/the-uks-waste-capacity-crisis-is-no-longer-a-future-problem/?utm_source=MKTG?utm_campaign=blogs?utm_content=?utm_medium=facebook