28/09/2026
3 weeks into our new project in Colby and the extension is starting to take shape.
60+ tonnes of soil and waste wheelbarrowed out and 8 cubic metres of concrete wheelbarrowed back round along with 20 pallets of blocks 💪.
Timber floor installed and concrete T beams installed for an outside patio at floor level means we can now move on and get the blockwork finished off this week, although we have a couple weeks wait for a special order lintel for the front window which is being specially made for this job in Ireland.
Let's hope the nice weather stays with us for a couple more weeks to allow us to get the roof on and watertight before winter sets in