DJB Model Engineering Ltd

  • Home
  • DJB Model Engineering Ltd
Directions Website Contact the business

DJB Model Engineering Ltd DJB Model Engineering Ltd is a manufacturer of 15mm/16mm ready-to-run live steam engines and kits.
(1)

DJB Model Engineering Ltd is a manufacturer of 15mm/16mm ready-to-run live steam engines and kits as well as conversions to coal-firing for existing mass-produced models. We have numerous useful items such as whistles, lamps, axle pumps, blowdown valves and other live steam fittings.

Not sure where to start on August’s activities, it has been a busy and diverse month.Had three locos in for servicing, c...
04/09/2026

Not sure where to start on August’s activities, it has been a busy and diverse month.
Had three locos in for servicing, coal fired Ragleth a gas fired Superior and RH Bertie
The coal fired Ragleth suffering from customer using tap water and required new water gauge and boiler washout and service to all the fittings and crosshead pump all suffering from tap water scale.
Once sorted steam test and happy to say back to full working order.
Similar issues with the superior so general service and clean as the boiler paint was suffering badly due to contamination with baked on steam oil and badly discoloured. Bit of elbow grease and now like new. Full steam test before heading back to the customer.
Bertie same issue tap water so boiler washout and serviced all the boiler fittings. Its RC on the Regulator but the servo was erratic and making some nasty noises. Sounded like stripped gear teeth and causing the nasty sounds and erratic movement. New servo sourced and fitted and set up and now working and sounding like it should.
Next up fitting an RC whistle to a Silver Lady Anne, also made and fitted a set of our detailed dummy cylinder covers to finish off the look off.
Have another Lady Anne in for RC whistle fitting but had to stop work due to very worn-out chassis that need striping and replacement of most of the moving parts. Now awaiting approval to go ahead now I have some prices on replacement parts from RH. The Transmitter also had an issue with the on/off switch not working, intervisitation found it was very rusty. Looks like water had spilt on the switch and caused rust stopping the switch from working, now all sorted and working again. More on its progress in September update
Next a coal conversion of a Accucraft Joan, made a start on cutting out the footplate to take the boiler and axle pump which drive off the front axle. Lots of parts and materials on order and until those arrive not much more, I can do. More to come in late September and into October. The boiler sat in place is not the correct one, just using it as a space sample to check clearance and fit. The correct boiler parts I will be working on in September getting everything ready for assembly of the boiler.
Finally have a Billy and Lady Anne is for major work listed below.
Both loco bodies stripped of the old paint and after some modifications and details added will be spray painted in a Bronze Green and then fully lined out by Matt at Berryhill works.
Both locos are having RC whistles fitted and new Fossworks RC added.
List of mods include rear bunker and back cab sheet added to the Billy. New tank top filler and dummy tank vents
Dummy Westinghouse pump and pipework on both billy and Lady Anne
Repair to roof on Billy as the hinge was broken.
Details to add include:
front rear vac pipes both locos
Our detailed cylinder covers both locos.
RH buffer overlays
Add Accucraft style chopper couplings to buffer beams.
There are few other odds and sods to add not listed.
More to come end of September on the Billy and Lady Anne

With Accucraft announcing the new Caradoc for 2027 been looking at the possibility of offering coal fired conversion kit...
31/07/2026

With Accucraft announcing the new Caradoc for 2027 been looking at the possibility of offering coal fired conversion kit and RTRs ...
As its based on Talgarth chassis which is very good indeed and slide valves so offers smoothly and very controllable running.
Can’t see any reason why the Talgarth conversion will not drop straight in and just to make sure have access to one once they become available and two conversion kits on order already!
Don’t plan to do many so will be very limited so if it’s of interest, please contact me and least get your name on the list no obligation.

Few photos of the Taglarth coal conversion, may also offer our more detailed buffer beams as an add on and larger lubricator and whistle ...

31/07/2026

two video clip of the silver Lady Anne whistle on test and the coal fired Baldrig first steam. few small adjustments made and all was fine and steaming well.

Another month gone how they are flying by and August tomorrow.Busy month as ever and completed the installation of an RC...
31/07/2026

Another month gone how they are flying by and August tomorrow.
Busy month as ever and completed the installation of an RC whistle to silver Lady Anne and made and fitted a set of our detailed cylinder covers and steam chest.
Completed the conversion and build of a baldric to coal, all finished and tested so ready to ship onto the customer.
Small batch of whistles also completed, plus another four ready to install into another silver Lady Anne and Lady Anne x2 and a Billy, all planned in for August and into September.

July is upon us!! How summer is flying by? Hot week for all, been out in the workshop at 5:30am to get some work done be...
26/06/2026

July is upon us!! How summer is flying by? Hot week for all, been out in the workshop at 5:30am to get some work done before it gets unbearable, still its only 92c today did reach 98c on Wednesday. Do wish the government would switch on those giant fans they installed across the land to keep us cool.....ones around here are all switched off.
Busy June as ever, completed testing and shipped out the coal fired Edrig conversion and completed a batch of whistles and detailed cylinder covers. Rest of the month’s been working on a coal conversion of a Ragleth but adding a Simply 7/8th Body kit.
I supplied the kit back in 2013 but seems it sat in a cupboard all that time, it has been dusted off by the customer and sent to me to do the work. As with many of these kits fair few parts missing too that need replacing or making from new.
The main conversions complete as is the soldering up of the body kit, this includes making inner tanks to hold water for the pump.
Hope to complete the build this coming week ready to start painting, so hope the weather cools down as trying to paint in this weather would be a real no no
oh forgot started on producing a firing set for a customer

still have one set of the detailed cylinder covers left suitable for likes of Katie Billy With steam pipes and cylinder ...
19/06/2026

still have one set of the detailed cylinder covers left suitable for likes of Katie Billy
With steam pipes and cylinder lubricator £48-00 pair plus P/P

Was asked to produce a few of our detailed dummy cylinder covers to fit RH range of models.I have few spares left over f...
13/06/2026

Was asked to produce a few of our detailed dummy cylinder covers to fit RH range of models.
I have few spares left over for sale
Cylinder cover with plain steam chest £35-00 pair plus P/P
With steam pipes and cylinder lubricator £48-00 pair plus P/P
Be quick as only two pairs of each left .....

What happened in the month of May?Edig coal conversion, now all finished and steam tested this morning and passed with f...
29/05/2026

What happened in the month of May?
Edig coal conversion, now all finished and steam tested this morning and passed with flying colours.
This could be the last Edrig I will see for conversion as they are becoming as rare as hen’s teeth and suffering from extreme ware and not worth converting.
This Edrig was in excellent condition and should be good for some years in service as a coal fired conversion. I first started the coal conversions of Edrig back in 2006 and the attached photo shows the first two conversion I ever did, the Maroon Edrig is still going strong and see it every year at a friend’s steam up. Reason its still going strong it has been well looked after by its owner for all those years.

1st of May how did that happen? ....Busy April in the workshop with the following being worked on. • Kit for a coal fire...
01/05/2026

1st of May how did that happen? ....
Busy April in the workshop with the following being worked on.
• Kit for a coal fired Emma completed ready to ship, this has the 8 wheeled bogie tender kit as well and been modified to the mk2 version (plan is to produce a small batch of RTR in 2027 in coal and gas, had plans for that this year but having to re plan everything)
• Batch of whistle started to be completed in May for dispatch
• Coal fired Edrig conversion is making steady progress and again hope to complete by the end of May or early June.
• One of our early manning Wardle L&Bs built 1996 with original paperwork and exactly 30 years old in for some TLC as it has a few issues and then needs refitting with RC as that’s missing. Found on eBay and brought for a steal!
• Finally, two new projects to be worked on in the coming months, more to come on those

Address


Alerts

Be the first to know and let us send you an email when DJB Model Engineering Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to DJB Model Engineering Ltd:

Shortcuts

  • Want your business to be the top-listed engineering company?

Share