01/11/2020
Wall completed on grade 2 listed building. Half wall knocked down and rebuilt due to soft ground. Rest of wall ground out and repointed with recessed pointing. Original copings removed, cleaned and re-layed. All built to grade 2 building guidelines using rough lime mortar mix.