30/07/2025
Thatβs 2 rooms fully plastered for .sjoinery
This was originally 2 separate rooms .sjoinery did a complete reset taking everything back to brick π§±
A knock through was then completed to give an open plan layout
K1 plastering then taken over with the plastering work to put the ceilings and walls back together πͺπ½
This time around FLAT , LEVEL and SMOOTH !!
Handing back over .sjoinery the finishing touches was then completed
Sliding doors
Radiators
Acoustic panelling
Custom built storage units
Skirting
Architrave
Great results and a good team effort !!
sjoinery itβs been a pleasure as always ππ½π