SGW Building & structural Finishing

SGW Building & structural Finishing Plastering, dry lining, Painting, Decorating, Tiling, plumbing, kitchens, bathrooms.

            SGW Building & structural Finishing
24/07/2024

SGW Building & structural Finishing

Downstairs toilet renovation. Stripped out, re plumbed, plastered, tiled and finished to a high standard.
21/04/2024

Downstairs toilet renovation. Stripped out, re plumbed, plastered, tiled and finished to a high standard.

Leaking wet room ripped out. Replaced with a stone resin tray, new enclosure. A new shower valve fitted to replace the o...
12/03/2024

Leaking wet room ripped out. Replaced with a stone resin tray, new enclosure. A new shower valve fitted to replace the old built-in valve. Shower panels and tiles fitted to unsure the room is watertight.

New doors hung. New handles and latches.Some slight alterations needed to the door casings.
10/03/2024

New doors hung. New handles and latches.
Some slight alterations needed to the door casings.

05/01/2024

168 Followers, 17 Following, 64 Posts

02/01/2024

From bedroom to bathroom!

Send a message to learn more

Revamp from wood at the front of the house. Looked so nice the neighbors had theirs done too!
11/10/2023

Revamp from wood at the front of the house. Looked so nice the neighbors had theirs done too!

Kitchen units fitted and floor tiled.Worktop fitted by Wren fitters.Sink and tap plumbed in and fridge fitted.
19/06/2023

Kitchen units fitted and floor tiled.
Worktop fitted by Wren fitters.
Sink and tap plumbed in and fridge fitted.

Bedroom given a face lift. Wardrobes given a new coat of paint and new wallpaper to complement throughout. Ceiling and w...
18/06/2023

Bedroom given a face lift.
Wardrobes given a new coat of paint and new wallpaper to complement throughout. Ceiling and woodwork have also been freshened up with a coat of paint.

Old flags were taken up. New drainage put around property. New retaining wall built to create ramp.Old flags were reused...
29/03/2023

Old flags were taken up. New drainage put around property. New retaining wall built to create ramp.
Old flags were reused, plus new flags to finish off.

Bath replaced with a walkin shower.New tiles throughout and new suite.
29/03/2023

Bath replaced with a walkin shower.
New tiles throughout and new suite.

Address

Wakefield
WF2

Opening Hours

Monday 8am - 8pm
Tuesday 8am - 8pm
Wednesday 8am - 8pm
Thursday 8am - 8pm
Friday 8am - 8pm
Saturday 8am - 8pm

Telephone

+447956324809

Website

Alerts

Be the first to know and let us send you an email when SGW Building & structural Finishing posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to SGW Building & structural Finishing:

Share