05/09/2026
It’s been a busy few days on site!
We’ve been making great progress on our project to redevelop this building into four new flats, with plenty happening across all floors.
Over the last few days, the team has been busy:
🧱 Knocking out openings, pointing and rebuilding brickwork where needed
🗑️ Clearing and bagging rubble ready for the skip
🏗️ Setting up acro props on the top floor ready for knock-outs and lintel changes
🪵 Installing joists in Flat 4 and building the ensuite stud wall
⬆️ Moving joists and steel upstairs ready for the mezzanine installation
🔩 Installing the mezzanine steel and trimmers for the new staircase
🪟 Installing and dry-packing a new lintel above the landing window
🧱 Repairing cracked walls and rebuilding the sides where required
🔨 Chipping out old ground-floor lintels and starting the installation of new ones
⚒️ Fitting joist hangers and tightening fixing bolts
A lot of hard work goes on behind the scenes at this stage, but it’s great to see the layout and structure of the four flats really starting to take shape.
Watch this space for more updates as the redevelopment continues! If you have a renovation or development project in mind, get in touch with Buildcraft Developments.