22/07/2026
💪 Another challenging project completed!
This one certainly tested us from start to finish. With no access for machinery, every bit of excavation had to be completed by hand, removing nearly 40 tonnes of soil, concrete, clay and stone using 2 x 8-wheel grab lorries before we could even begin.
Over the course of 7 working days, we:
✔️ Removed and disposed of nearly 40 tonnes of soil,concrete & clay by hand.
✔️20 tonnes of MOT Type 1, compacted in 75mm layers to achieve a strong, solid sub-base built to last.
✔️ Laid over 30 edgings on a strong ballast mix.
✔️ Installed 11m of underground drainage, 12m of surface drainage, x2 110mm outlets and an access chamber to ensure efficient water flow throughout the winter months.
✔️ Corrected the finished levels by lowering the new concrete pad to approximately 6 inches below the damp-proof course (DPC), as the original concrete was around 1 inche below, helping to protect the property from potential damp issues.
✔️50m of exspantion foam
✔️ Pumped 8m³ of fibre concrete using a 30m line due to the restricted access.
✔️ Finished the concrete with a brush-textured surface, providing extra grip and making it safer for the family all year round.
✔️5m High washing line
No shortcuts, just plenty of hard graft, quality workmanship and attention to detail
Another quality finish and another happy customer who can enjoy their new outdoor space for many years to come 👌
What the customer wants the customer has🤝
📞 Get in touch today for a fast, free, no-obligation quotation. We pride ourselves on quality workmanship and customer satisfaction—you won’t be disappointed!
📧 Email: [email protected]
📱 Call: 07596 368333
🌐 Or contact us through our
website https://www.hqps-info.co.uk
゚viralシ