Property & Development

Property & Development Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Property & Development, Construction Company, West Kirby.

Any plasterers want any work for the next couple of weeks (potentially longer if it works)Looking for boarding out and s...
13/07/2023

Any plasterers want any work for the next couple of weeks (potentially longer if it works)
Looking for boarding out and skimming.

And there it was…gone! We have been lucky with the lack of rain. All the old timbers  are off (some were as rotten as a ...
01/12/2022

And there it was…gone! We have been lucky with the lack of rain. All the old timbers are off (some were as rotten as a skunks un**es) and tomorrow sees us positioning pad stones to support the new ridge steels and then we can get cracking with the new roof. Can’t wait.

And so the roof replacement starts on Oak Cottage. Wish us luck with the weather please!
25/11/2022

And so the roof replacement starts on Oak Cottage. Wish us luck with the weather please!

Stripped the old roof slates and timbers out so we can replace them with better timbers. Had to replace the brickwork th...
02/11/2022

Stripped the old roof slates and timbers out so we can replace them with better timbers. Had to replace the brickwork that sits below the wall plate but it’s all sorted now. Got the timbers in today despite the wind and rain. Membrane and batton next and then onto the extension roof.

Now the ginormous scaffold is up, the Slate roof is the next item to be stripped off and the timbers removed ready for n...
01/11/2022

Now the ginormous scaffold is up, the Slate roof is the next item to be stripped off and the timbers removed ready for new steels and roof timbers for vaulted ceiling for all the upstairs bedrooms.
It will be a shame to see the slates go and be replaced with a more modern tile but there are 3 different sizes of slates and there’s a lot of damage to them.
More updates to come along with some progress picture of the extension

When your customer gets a full structural survey carried out and they don’t pick up the blindingly  obvious cracks betwe...
28/10/2022

When your customer gets a full structural survey carried out and they don’t pick up the blindingly obvious cracks between various extensions (of which there are 7 on this build, plus our two). Cracks big enough to fit your whole hand in!
Time to get the render off and open up the cracks ready to re built and stitch the walls together. More knocking out to go but we’ll 1m at a time from@the ground floor up to the gutters. PAD to the rescue 👍🏻

Big ol’ steel gone in nicely today. Slow and steady wins the day.Measure 5 times, cut once 😂
12/10/2022

Big ol’ steel gone in nicely today. Slow and steady wins the day.
Measure 5 times, cut once 😂

2 x new 7.5m steels across the front of the house ready for smaller of the two extensions to be built. 14 Acro props lat...
09/09/2022

2 x new 7.5m steels across the front of the house ready for smaller of the two extensions to be built. 14 Acro props later, they are in and sitting pretty 👍🏻

Old floor joists out and new ones on sat on wall plates as the walls aren’t the best. This is going to be a master bedro...
30/07/2022

Old floor joists out and new ones on sat on wall plates as the walls aren’t the best. This is going to be a master bedroom with open plan bathroom
The strip out continues but we can’t wait to get the steels in for the mezzanine and gallery

Building up the footings to DPC. There’s going to be a retaining wall off the side of the house so we can level the driv...
04/07/2022

Building up the footings to DPC. There’s going to be a retaining wall off the side of the house so we can level the driveway for the customer but after that there will be a a lower area for a big shed hence the bricked back wall. The grey blocks will be under the finished height of the driveway.
Then we got the laser out and got our levels for DPC for the small extension at the front.
If it’s right at the bottom it will be right at the top.

When you do a bathroom, make sure that the OCD kicks in. Line up everything.Literally laser straight, tiles, door gap, m...
01/07/2022

When you do a bathroom, make sure that the OCD kicks in. Line up everything.
Literally laser straight, tiles, door gap, middle of the tap and window frame.
Easy on tbe eye.
This wasn’t finished when I took the pic but it’s virtually done now 🙌🏻🙌🏻🙌🏻, it’s been a mammoth slog.
Total rip out, new window and wall block beneath it (the old window was on ply), new panneling, tiles in the shower, new loo, basin and unit, floor tiles and free standing bath.
Pic updates once it’s decorated

Another day in the office and the sun is shining while we dig footings.It’s all go on this build today!
24/05/2022

Another day in the office and the sun is shining while we dig footings.
It’s all go on this build today!

Address

West Kirby

Telephone

+447876685199

Website

Alerts

Be the first to know and let us send you an email when Property & Development posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Property & Development:

Share