Stakeout Engineering Ltd

Stakeout Engineering Ltd Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Stakeout Engineering Ltd, Engineering service, Wisbech.

Setting out of all elements inc: groundworks, drainage, steel work, concrete frame, piling, residential, commercial, infrastructure.

- Level Surveys

- As built Surveys

-Quality management and control

- Temporary works coordination

Loving the Topcon Hyper XR at the moment kindly supplied by . Keeping up with the harsh environment of quarry surveying....
20/05/2026

Loving the Topcon Hyper XR at the moment kindly supplied by . Keeping up with the harsh environment of quarry surveying.

Earlier this year we completed a full 3D scan of a large portal frame. This was then used to determine the amount of reu...
15/05/2026

Earlier this year we completed a full 3D scan of a large portal frame. This was then used to determine the amount of reusable steel to be recycled for future projects. The scan data was key to confirm steel dimensions that were inaccessible.

Big thanks to for helping on this project!

23/04/2026

Steel frame setting out on the fourth floor 💪🏼

A throwback to an incredible project: a detailed 3D scan of a 450m historical tunnel! The lack of distinct features was ...
09/04/2026

A throwback to an incredible project: a detailed 3D scan of a 450m historical tunnel! The lack of distinct features was a real registration challenge, but our team tackled it head-on.

We leveraged the power of the Trimble X7 alongside the Rothbucher Systeme's efficient prism-to-scan target swapping to maintain exceptional accuracy throughout. Diving deep into the data, LSS and their 3D Vision software were key for seamless point cloud processing, allowing us to generate highly detailed long and cross sections every 5 meters.

To deliver maximum value, we utilized Nubigon for an immersive 3D walkthrough and Nira to provide a fully navigable and annotatable 3D model. Our client now has all the tools to analyze the tunnel data in unprecedented detail!

02/04/2026

Drone survey completed in Haverhill this week. Never forget your GCPs for accurate survey data!

27/03/2026
Setting out grid lines on the 3rd & 4th floors in Cambridge. This will be ready for steel erecting Monday!
21/03/2026

Setting out grid lines on the 3rd & 4th floors in Cambridge. This will be ready for steel erecting Monday!

05/03/2026

Setting out a small pond this morning

Address

Wisbech
PE140LZ

Alerts

Be the first to know and let us send you an email when Stakeout Engineering Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Stakeout Engineering Ltd:

Share