06/10/2026
📝𝗪𝗶𝗻𝗱𝗹𝗮𝘀𝘀 𝗥𝗲𝗰𝗼𝗻𝗱𝗶𝘁𝗶𝗼𝗻𝗶𝗻𝗴 𝗼𝗻 𝗮𝗻 𝗟𝗥 𝘁𝗮𝗻𝗸𝗲𝗿
In this case study, INJEGOV investigated and reported, 𝘄𝗶𝘁𝗵𝗶𝗻 𝗮 𝟴-𝗱𝗮𝘆 𝗱𝗲𝗮𝗱𝗹𝗶𝗻𝗲, the condition of forward mooring winch/windlass assemblies on an LR tanker.
𝗗𝗲𝘀𝗽𝗶𝘁𝗲 𝘁𝗵𝗲 𝘀𝗶𝗴𝗻𝗶𝗳𝗶𝗰𝗮𝗻𝘁 𝘄𝗲𝗮𝗿 𝗮𝗻𝗱 𝗰𝗼𝗿𝗿𝗼𝘀𝗶𝗼𝗻, 𝗼𝘂𝗿 𝗲𝘅𝗽𝗲𝗿𝘁𝘀 𝗽𝗲𝗿𝗳𝗼𝗿𝗺𝗲𝗱:
🔷 Complete dismantling of 2 pcs forward mooring winch/windlass assemblies
🔷 Complete overhauling of all parts, including drums, brakes, gears, shafts, and bushes
🔷 Machining and rebuilding by welding of 4 pcs shafts in the way of all the damaged journals
🔷Fabrication of more than 20pcs of bushes, including split type ones in our CNC machines from G12 bronze material that we keep in our stock
🔷Boring of drum bush housings and rebuilding of drums in the way of corroded brake band landing surfaces
🔷Renewal of brake bands and repair of brake mechanisms
🔷Supply of new roller bearing
🔷Straightening of 1 pc bended shaft
𝗥𝗲𝗮𝗱 𝗮𝗹𝗹 𝗮𝗯𝗼𝘂𝘁 𝗶𝘁:
🔗https://injegov.gr/windlass-reconditioning/