06/02/2026
Factory Acceptance Test (FAT) successfully conducted for PT. PLN Indonesia Timur (PLN Papua).
Ensuring reliability and performance through:
• 2 sets SPro3.110-100 with DC Stabilizer
• 3 sets Industrial Inverter DC/AC 5 kVA (110Vdc/220Vac)
• 2 sets 90 Cells Saft SBM100 – 100 Ah Medium Rate
Committed to delivering quality power solutions that meet operational standards and customer requirements.