04/06/2026
It's a Monster Jam for the DS8! The SpreadTec DS8 dust suppression water unit carried out dust suppression for the Monster Jam 2026 in the Principality Stadium, Cardiff.
For the event crews transformed the pitch using a meticulous multi-day process. The DS8 was on hand to assist with moisture content of the specialised soil.
The SpreadTec DS8 chassis mounted 8,000 ltr water tanker on a Wacker Neuson DV90 dual view is multifunctional, compact & manoeuvrable.
Distributed in the UK by Reeds Construction & Engineering Ltd.