AAIM ENCON

AAIM ENCON AIMNYS offers consultancy and turn-key services for Architectural, interior, and landscaping. 1. Individual House : 7.5 Percent on the cost of works assigned.

Comprehensive Architectural Services

As described for Comprehensive
Architectural Services in the Conditions
of Engagement including Site
Development but excluding Landscape
Architecture, Interior Architecture,
Graphic Design and Signage. Single Block Housing and sites upto 0.5 hectare : 5 Percent on the cost of works assigned. For a site more than 0.5 hectare and upto 2.5 hectares: 3.5 Percent o

n the cost of works assigned. For a site more than 2.5 hectares and upto 5 hectares : 2.5 Percent on the cost of works assigned. For a site more than 5 hectares : 2 Percent on the cost of works assigned. Note : The fees payable in marginal cases in respect
of clauses (iii) to (v) shall not be less than the
maximum fee payable in their respective preceding
clauses.

1.2 All projects other than housing

As described for Comprehensive
Architectural Services in the Conditions
of Engagement including Site
Development but excluding Landscape
Architecture, Interior Architecture,
Graphic Design and Signage.

5 Percent on the cost of works assigned.

1.2.1 Repetition of the building in the same campus

As described for Comprehensive
Architectural Services in the Conditions
of Engagement including Site
Development but excluding Landscape
Architecture, Interior Architecture,
Graphic Design and Signage.

5 Percent on the cost of works assigned.

1.2.2 Repetition of the building in the same campus

As described for Comprehensive
Architectural Services in the Conditions
of Engagement except Landscape
Architecture, Interior Architecture,
Graphic Design & Signage and Site
Development.

2.5 percent on the cost of works assigned

1.2.3 Repetition of the building at a different site

As described for Comprehensive
Architectural Services in the Conditions
of Engagement except Landscape
Architecture, Interior Architecture,
Graphic Design & Signage and Site
Development.

3.5 percent on the cost of works assigned.

1.3 Site Development [except 1.1 and 1.2]

As described for Comprehensive
Architectural Services in the Conditions
of Engagement except Landscape
Architecture, Interior Architecture,
Graphic Design and Signage [except
1.1 and 1.2].

2.5 Percent on the cost of works assigned.

1.4 Architectural Conservation/
Retrofitting/Additions and alterations

As described for Comprehensive
Architectural Services in the Conditions
of Engagement except Landscape
Architecture, Interior Architecture,
Graphic Design and Signage.

7.5 Percent on the cost of works as

2. Urban Design

As described for Urban Design/ Urban
Renewal in the Conditions of
Engagement. For all projects except Housing: 1 percent on the cost of works assigned, to be computed at a rate of Rs 6M per Sq.mt. of proposed built-up area. Housing Projects : 20 percent of the fee payable for housing, as stated in sub-clause 1.1 above, on the cost of works assigned, to be computed at a rate of Rs 6M per Sq.mt. In case of Urban Renewal projects fee payable shall be 1.5 times of the fee stated above based on actual cost of works assigned. Above fees are subject to a minimum of Rupees 240M.

3. Interior Architecture/Graphic design and signage

As described for Interior Architecture in
the Conditions of Engagement.

7.5 percent on the cost of works assigned

4. Landscape Architecture

As described for Landscape Architecture
in the Conditions of Engagement.

7.5 percent on the cost of works assigned

5. Site visits

Visits by an Architect/consultant in connection with Project for which commissioned. Outstation Visit :

Traveling, Boarding & Lodging Expenses

For each day
7. Documentation and Communication Charges

Applicable on all professional fee
payable to the Architect.

10 percent of the professional fees.

8. Verification and Certification of Contractor's Bills

Verification of Contractor's bills for
payment, based on progress of works
at site, measurements of works Certified
by the Construction Manager
(i.e. Clerk of Works/ Site Supervisor
or Construction Management
Agency) and in accordance with
Conditions of Contract, Drawings
and instruction issued.

1 percent in addition to above fees. Explanatory Notes:

For works costing upto Rs. 1400 M the professional fees may be negotiable between the Architect and the Client. When an Architect is engaged to undertake Comprehensive Architectural Services in respect of buildings/ Site Development and/ or Landscape Architectural Services as a follow up of an Urban Design/ Urban Renewal Scheme, his professional fee for Comprehensive Architectural Services/ Landscape Architectural Services shall be reduced by 20%. The current value of M is 1000

25/05/2024
Main jali door
25/05/2024

Main jali door

देवी सर्वभूतेषु बुद्धिरूपेणसंस्थिता। नमस्तस्यै नमस्तस्यै नमस्तस्यै नमो नमः ॥ वसंत पंचमी की हार्दिक शुभकामनाएंजय श्री कृष...
14/02/2024

देवी सर्वभूतेषु बुद्धिरूपेणसंस्थिता। नमस्तस्यै नमस्तस्यै नमस्तस्यै नमो नमः ॥ वसंत पंचमी की हार्दिक शुभकामनाएं

जय श्री कृष्णा........🙏🌹
राधे राधे....🌹🙏
🙏

07/10/2022

Interior project

18/08/2022


I pray to God that our love for each other keeps growing year after year. Happy Raksha Bandhan!                         ...
11/08/2022

I pray to God that our love for each other keeps growing year after year. Happy Raksha Bandhan!


Plot Area: 350 square yards Year: 2018-2022Location: VisnagarPhotographs     #                                          ...
24/02/2022

Plot Area: 350 square yards
Year: 2018-2022
Location: Visnagar

Photographs

#

Bungalows Elevation Associate work with safalya architects.
11/02/2022

Bungalows Elevation

Associate work with safalya architects.



Simandhar Height Associate work with safalya architects.
11/02/2022

Simandhar Height

Associate work with safalya architects.



Bungalows at Adipur Associate work with safalya architects.
11/02/2022

Bungalows at Adipur

Associate work with safalya architects.



Address

201 Paritosh Nr. Darpana Academy Usman Pura Pincode :380013
Ahmedabad
380013

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Telephone

+918401439699

Website

Alerts

Be the first to know and let us send you an email when AAIM ENCON posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share