30/07/2026
This road was in an extremely depleted condition. Upon some high level MDCs' request (not our demand), we constructed this GHADC's road that connects Hawakhana main road, excluding PWD drain (from Sangma & Sangma Bajaj Showroom) with William Point to Tura Government College road.
Work Alloted - 27th. January 2025.
Nature of work - Laying of normal paver blocks (We gave premium paver blocks, with extra designs and extra beautification works for free).
Payment taken - Zero from start to finish (have not honored the bill till now).
90 days for completion - We completed in 38 days (completion certificate and quality inspection issued).
Approach Road over the drain - Not included in the work (Though we wanted to, but we could not work without NOC from PWD/TMB and PHE, because it's a major drain with more than 200+ pipe connections beneath)