Pinnacle Construction Services

Pinnacle Construction Services All kinds of construction services are available under one roof

17/07/2024
21/11/2023

MASONRY WORKS @ 8 - 850
# Providing and laying in position of reinforced cement concrete work including bending, binding, centering, shuttering, finishing and reinforcement up to plinth level and columns above plinth level
# Brick work etc

21/11/2023

IRON FABRICATION @ 100 - 550
 Rate depends on the thickness of the iron pipe and roofing sheet.
 Rates will be calculated in per square feet for the roofing, however edges and fascia are calculated per running feet
 Additional rate will be incurred according to the higher level of the floor and the complexity of the designs.

21/11/2023

ELECTRIFICATION WORKS @ 8 - 2000
 Wiring cost is calculated in per running feet.
 The cost includes the task of scrapping brick wall and floor to place conduit pipe.
 Materials will be of branded and of good quality.
 High quality PVC conduit pipes with ISI certified will be used.
 Modular switch board will be used for easy maintenance and good appearance.
 Wiring for heavy equipment/appliances will cost more.

21/11/2023

Tile, Marble, Granite, SPC, Vinyl and Laminate flooring services @ 18 - 650
 Rate is calculated in square feet & running feet depending on the designs.
 Cost of tile, marble, granite differs with size, design, quality etc
 The labour cost includes cleaning and grouting etc
 Cost of the flooring may varies depending on the designs

20/11/2023

PLUMBING WORKS @ 10000 - 40000
Depending on the class & variant of the Bathroom

Bathroom Fittings with Toilet
 Fittings of pipeline, scrapping of brick wall to place pipeline, top fittings of shower, Water Closet, Basin & Mixer etc

Kitchen Fittings
 Fittings of sink , mixer, Hot & Cold pipeline, Water filter pipeline etc.
Repairing Works
 Repairing includes leakage repairing, checking all fittings and if require replacement of pipeline.

20/11/2023

GYPSUM, POP & PVC FALSE CEILING @ 70 - 180
 Rates are given in per square feet however edges and fascia are calculated per running feet.
 Additional charges may apply by considering the complexity of the designs.
# Simple Plain
# Design
# T- Ceiling 2*2

20/11/2023

PAINTING @ 10 - 18 labour cost

Cost of painting is calculated in unit of Square feet
 2 coats putty application,
 Smoothing the putty surface using sand paper
 Primer application
 Two coats paint application.
Painting design will cost higher considering the designs of the paint.

Wall Paper @ 700 -900 labour cost with adhesive
 Cost of wall paper depends on the quality/designs of the wall paper.
 Wall needs to be primer coated beforehand

20/11/2023

STAINLESS STEEL FABRICATION @ 850 - 2400
SS 202 Grade SS 304 Grade
 Rates will differ according to the work.
 Additional charges for Master Post will be levied in accordance with the design of the Post/Pillar.
 Cost may goes up depending on the complexity of the design.

# Simple Round Pipe Railing
# Simple Square Pipe Railing
# Design Railing
(Rate will be fixed after the finalization of the design)
# Railing With Glass

20/11/2023

ALUMINIUM FABRICATION @ 300 - 1000/sq.ft.

# WINDOW TYPES - 2 Channel, 3 Channel, Hinges
# DOOR TYPES - Hinges Door, Hanging, Sliding, Floor Spring Door
with 4mm/5mm/6mm/8mm/12mm Glass
# Cubicle Works with Glass/ACP/Bhutan Board
# Toughened Glass Door & Cubicle work with Stainless Steel Clamps & fittings
 Cost may differ according to quality, designs and dimensions of the fittings, handle, thickness of the glass etc.

20/11/2023

WALL CLADDING @ 350-600/sq.ft.
Interior & Exteriors
# Wall cladding with Glass (Glazing)
# ACP ( Aluminium Composite Panel) Wall cladding
# Cement Board/Plank Wall cladding
# HPL (High Pressure Laminates) Wall cladding

Rate will differ depending on the quality, thickness, complexity of work and designs of the sheet and section etc.

20/11/2023

Modular kitchen, Wardrobe, Shelves and other furniture works of plywood/MDF/HDF with laminates
Providing and fixing of cabinet with laminates and PVC banding edge @ Rs.1200 - 2400

 Rate is calculated on the basis of square feet.
 Rate differs with quality and brand of the fittings selected.
 Rate varies with the quality of the plywood MDF/HDF and laminate selected.
 Structure and designs of the kitchen, wardrobe will be as per your requirement
 Design of the kitchen and other furniture will be provided.

Address

New Checkon
Imphal
795001

Website

Alerts

Be the first to know and let us send you an email when Pinnacle Construction Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share