    in house    before1. Foundation PCC 2. Footing casting3. Back filling on plinth
31/03/2024

in house before
1. Foundation PCC
2. Footing casting
3. Back filling on plinth



Plastering of Water tank and Basement retaining walls after hydroproofing from outside can stop leakage and seapage in C...
31/03/2024

Plastering of Water tank and Basement retaining walls after hydroproofing from outside can stop leakage and seapage in Concrete frame and prevent steel corrosion and maximize life of construction.


Drawing Reading start from NOTES and  Finishes with ex*****on.Drawings and detailed drawing plays major role performing ...
31/03/2024

Drawing Reading start from NOTES and Finishes with ex*****on.
Drawings and detailed drawing plays major role performing Design on paper INTO *****on .

Steel fabrication must be checked prior casting of concrete elements. Check Layer system, X-Y Y-Z Z-X Directions, Mid En...
31/03/2024

Steel fabrication must be checked prior casting of concrete elements. Check Layer system, X-Y Y-Z Z-X Directions, Mid End span distribution, Bends, Hooks, Development length, Overlapping length, Bar cutting schedule, Joint in horizontal Vertical bars, Rings/stirrups and extra steel in detail.

Allignment horizontal and vertical both must be checked Pre and post casting of concrete elements to strengthen the RCC ...
31/03/2024

Allignment horizontal and vertical both must be checked Pre and post casting of concrete elements to strengthen the RCC frame stability and load transfer system.

Shuttering (Ghugu) pludging and construction joint treatment plays a main role for preventing  leakage and seapage in Ba...
31/03/2024

Shuttering (Ghugu) pludging and construction joint treatment plays a main role for preventing leakage and seapage in Basement RCC or retaining walls prior Water proofing, plastering and back filling.

Slump test and cube test, the necessary procedures to check the workability and strength accrued by concrete.
31/03/2024

Slump test and cube test, the necessary procedures to check the workability and strength accrued by concrete.

Only proper and clean shuttering can save your material and can give the best     .
31/03/2024

Only proper and clean shuttering can save your material and can give the best .

31/03/2024


31/03/2024

24/03/2024

Address

Nirman Nagar , Pratap Nagar
Jaipur
302033

Opening Hours

Monday 9am - 6pm
6pm - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm
Saturday 9am - 6pm
Sunday 9am - 5pm

Telephone

+919413778833

Alerts

Be the first to know and let us send you an email when Lakshay Construction & Consultancy posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Lakshay Construction & Consultancy:

Share