Omac Italy

Indicazioni Sito Web Contatta l'azienda

Omac Italy Macchine e Attrezzature per la tesatura aerea, ferroviaria e la posa di cavi. Macchine e Attrezzature per la tesatura e posa dei cavi.

OMAC provides a wide range of systems for railway stringing but we also understand that our clients need complementary e...
09/10/2026

OMAC provides a wide range of systems for railway stringing but we also understand that our clients need complementary equipment.

That’s why we also offer a wide selection of running-out blocks designed for a safe stringing of conductors during railway line projects and maintenance operations.

With sheave diameters ranging from 120 to 150 mm, our solutions support the contact wire and the rope allowing the cable to run smoothly without damage.

Ask our Area Manager to help you choose the best option for your railway stringing project!

OMAC provides an endless range of customized solutions for its clients!Our 500 kN hydraulic puller, model UP500, was ori...
29/09/2026

OMAC provides an endless range of customized solutions for its clients!

Our 500 kN hydraulic puller, model UP500, was originally designed for underground transmission cable and pipeline rehabilitation projects and it has already proven its reliability in the crude oil industry but its applications go far beyond that.

It can also be used for:

✅ Relining operations with HDPE (High-Density Polyethylene) liners in oil fields
✅ Lining pipelines that carry drinking water or other liquids
✅ Rehabilitation of sewer lines to prevent soil and groundwater contamination by stopping liquids and chemicals from escaping into the environment

These are sectors that require high standards of impermeability, UV stability, chemical resistance, cost-effectiveness, and long service life, all key features that the UP500 is designed to deliver thanks to liners acting as protective barriers between the fluid and the steel, helping to reduce the risk of corrosion, erosion, and environmental contamination.

Equipped with a 105 kW diesel engine, two Ø 525 mm bull-wheels and a steel rope reel capacity of 700 meters for Ø 38 mm rope, the UP500 is the ideal solution for large-scale, high-demand projects where operators need to efficiently pull long lengths of lining material.

Want to know more? Head to our website to explore all UP500 technical features!

Day 2 at ENERGETAB done! ✅️We were lucky with the weather today, making it even easier to welcome the many visitors who ...
16/09/2026

Day 2 at ENERGETAB done! ✅️

We were lucky with the weather today, making it even easier to welcome the many visitors who came by the OMAC and Amin Power Energy booth.

Our 50 kN hydraulic puller, model P50.U, was one of the highlights, attracting a lot of attention. It was a great opportunity to show it up close, dive into its technical features and share some of the real-world projects where it has been used for cable and pipe laying.

Its prompt availability has also attracted interest from customers who are considering the P50.U for their upcoming projects, particularly when timing is critical and the equipment needs to be available in line with the project start.

Come and see us at Booth L3.1!

ENERGETAB kick-off! Come and meet us and our partner Amin Power Energy at stand L3.1.Our P50.U hydraulic puller takes ce...
15/09/2026

ENERGETAB kick-off!

Come and meet us and our partner Amin Power Energy at stand L3.1.

Our P50.U hydraulic puller takes center stage, giving visitors a 360° view of the machine and offering a glimpse of what they can expect from our wider range of underground cable and pipe laying solutions.

Meet OMAC at ENERGETAB 2026!From 15 to 17 September, we’ll be in Bielsko-Biała, Poland, at the ENERGETAB International E...
11/09/2026

Meet OMAC at ENERGETAB 2026!

From 15 to 17 September, we’ll be in Bielsko-Biała, Poland, at the ENERGETAB International Energy Fair and we look forward to welcoming you at our stand.

Together with our trusted partner Amin Power Energy, we’ll be showcasing our 50 kN hydraulic puller, model P50.U.
Designed for demanding underground cable and pipe-laying applications, the P50.U is a powerful and reliable solution for contractors looking to take on new installation projects and work efficiently on site.

📍 Location: Bielsko-Biała, Poland
📌 Stand: L3, 1 OE

Are you planning to visit the fair? Register here: https://energetab.pl/en/rejestracja-zwiedzajacych/

Do you want to discover the P50.U in more detail?
Check out the full datasheet on our website: https://www.omac-italy.com/p50-u/

In our article “Safety in Underground Cable Laying: Best Practices and Guidelines” we highlight the importance of preven...
10/09/2026

In our article “Safety in Underground Cable Laying: Best Practices and Guidelines” we highlight the importance of preventing issues that can arise during cable laying projects, from environmental exposure and excavation hazards to operator risks and potential utility damage.

With over 70 years of experience OMAC is ready to handle and prevent unexpected challenges ensuring a safer and more worry-free jobsite for those who rely on our solutions.

How does OMAC further enhance safety across its machines and equipment? Here are a few glimpses 👇

✅ A robust machine structure featuring a protection grid, double anchoring system as well as front and back stabilizers to ensure safe positioning even on unstable ground

✅ Our maintenance-free load cell with direct force reading to provide reliable data even when the machine is stationary. Our load cell continuously monitors the applied force and instantly sends data to the electronic touchscreen display (DEG) giving operators accurate, real-time information unaffected by speed or temperature

✅ Our remote control that allows the operator to run the machine from a safe distance with a range of up to 100 meters and the ability to stop operations instantly at any time

✅ Moreover, every OMAC machine undergoes a rigorous 12-hour testing process at our in-house test field before being delivered to the customer. This includes a weight-lifting system that thoroughly checks the hydraulic and mechanical components of our machines, with testing forces of up to 60 tons. The machine is then put through a real-life simulation of the laying operation, ensuring it is fully tested and ready for the jobsite!

Read the full article on our blog by clicking the link below ⬇️
https://www.omac-italy.com/safety-underground-cable-laying-best-practices-and-guidelines/

Learn essential safety practices and guidelines for underground cable laying, ensuring the protection of workers and infrastructure while maintaining efficiency in cable installation.

Others may have introduced it recently, but we have had our digital display for over 10 years and we have kept it consta...
21/08/2026

Others may have introduced it recently, but we have had our digital display for over 10 years and we have kept it constantly updated with the latest technology! Even better, it’s built-in as standard on all our machines 💪

From the start, we understood how important it is for operators to easily read and monitor key values in real time. That’s why our HMI system clearly displays all essential working parameters: pulling and tension force, speed, distance covered, cable/conductor length, and elapsed time. All data is automatically recorded and stored in the internal memory, with no external devices required.

You can also download recordings and settings directly to your mobile device thanks to the mirror display function and with a memory capacity exceeding 200 km of lines, you’ll never run out of space!

Here’s the latest evolution: the brand new DEG 10. With its 10” touchscreen display, it’s even easier to read on-site, while its direct panel controls ensure added safety and precise real-time monitoring further enhanced by the integrated load cell and encoder system.

Contact us to learn more about it!

OMAC never stops supporting its clients. Our 24/7 global service starts from our HQ and is backed by trusted partners an...
15/08/2026

OMAC never stops supporting its clients.

Our 24/7 global service starts from our HQ and is backed by trusted partners and after-sales specialists. Whether you need spare parts, product information, technical support, or help with specific issues, you can always count on our Customer Service team!

OMAC’s top priority = safety from the very first step to the final stage of every stringing project!That’s why OMAC dual...
16/07/2026

OMAC’s top priority = safety from the very first step to the final stage of every stringing project!

That’s why OMAC dual-circuit machines feature a combined dual synchronization system (digital and mechanical) designed to deliver perfectly balanced stringing of twin bundle conductors. Whether using a fixed or balanced headboard, operators can manage the system easily and safely through the main touchscreen interface.

In addition, OMAC continues to offer its proven mechanical synchronization controlled via a dedicated lever positioned in a protected area away from the bull wheels always ensuring maximum operator protection.

Safety comes first for your projects with OMAC machines and equipment!

Ease your jobsite operations with our truck-mounted tensioner!Our model F120.150.4.CM is an example of our commitment to...
11/06/2026

Ease your jobsite operations with our truck-mounted tensioner!

Our model F120.150.4.CM is an example of our commitment to delivering versatile solutions designed to adapt to any jobsite condition, helping reduce project ex*****on time and simplifying on-site logistics where quick mounting and dismounting are required.

This tensioner is designed to be installed on a truck platform and is suitable for stringing one, two, three, or four ropes or conductors.

With a maximum tension force of 150 kN and 2 × Ø 1500 mm bull-wheels this tensioner is powered by an 87 kW diesel engine and can be equipped with one or two self-loading reel winders, further enhancing operational versatility and ease of use for the operator.

If you are looking for a solution to simplify jobsite and off-site operations contact our Area Manager who will help you choose between our truck-mounted and crawler system solutions.

Indirizzo

Via Pizzo Camino 9, Chiuduno
Bergamo
24060

Orario di apertura

Lunedì 08:30 - 17:30
Martedì 08:30 - 17:30
Mercoledì 08:30 - 17:30
Giovedì 08:30 - 17:30
Venerdì 08:30 - 17:30

Notifiche

Lascia la tua email e sarai tra i primi a sapere quando Omac Italy pubblica novità e promozioni. Il tuo indirizzo email non verrà utilizzato per nessun altro scopo e potrai annullare l'iscrizione in qualsiasi momento.

Contatta L'azienda

Invia un messaggio a Omac Italy:

Scelte rapide

Condividi