Chiama Indicazioni Sito Web Contatta l'azienda

LEITNER Welcome to the official LEITNER page 🚠 www.leitner.com

LEITNER - the ropeways expert / LEITNER facebook Terms of Use

LEITNER, an innovative engineering company with over 130 years of successful history, is at the forefront of technological developments in a wide variety of products. Winter sport is the core business of LEITNER where it offers a broad range of products. Offering a diversified product range serves to fulfill the most varied requirements and needs of the customers. Advanced technical developments as well as security and impeccable quality have allowed the company to grow into a market leader. The main reasons for the success are innovation and advanced technology which can be traced back to, among other things, the expert work of the highly qualified employees. Even if cableways have up to now been utilized primarily in winter tourism, their use as an environmentally-friendly passenger transport system is increasingly in demand in urban areas. Legal Notice: https://www.facebook.com/leitnerropeways/app_250624884981937


Legal Notice for mobile devices:

Company Name: LEITNER AG
President: Anton Seeber
Entry in the register of the Chamber of Commerce Bozen Nr: 00123790214
VAT Registration number: IT 00123790214
Address:
Brennerstraße 34
39049 Sterzing
Italy
0039 0472 724111
[email protected]
www.leitner.com

Liability Note: Despite careful content control we are not liable for external linked contents.

🚁 High-altitude logistics in action! 🏔️Last week, helicopter operations brought the 74 cabins of the new GD10 Chaz Dura ...
15/10/2026

🚁 High-altitude logistics in action! 🏔️

Last week, helicopter operations brought the 74 cabins of the new GD10 Chaz Dura in La Thuile safely into position, transforming the skyline and bringing the project one step closer to completion. 🚡✨

The installation is now in the commissioning phase, with teams working intensively on the final activities before opening. ⚙️🔧

An exciting milestone as we approach the final stretch of this remarkable project in the Aosta Valley! 🙌

La Thuile Aosta Valley - The Wild Side of Mont Blanc​

13/10/2026

🚡 LEITNER Showroom. A place for innovation, expertise and exchange is taking shape. ✨

The interior fit-out is progressing steadily, transforming the space into a modern environment designed for collaboration, inspiration and meaningful conversations. 🏗️⚙️

Stay tuned – we look forward to sharing the final result with you soon! 👀

With the opening of the new Operations & Technology Hub in Pollein (Aosta, IT), LEITNER is further strengthening its pre...
08/10/2026

With the opening of the new Operations & Technology Hub in Pollein (Aosta, IT), LEITNER is further strengthening its presence in one of Italy’s key Alpine regions.

Covering around 800 m² within a 3,500 m² company-owned area, the new hub brings our expertise even closer to the areas where our technologies operate, allowing us to provide even more efficient and timely local support to our customers.

Representing an investment of more than €3 million by the HTI Group, the new hub brings together the expertise of LEITNER, Prinoth Snow Groomers​​, DEMACLENKO​​ and TROYER​ under one roof..

A new base, built on a presence and partnership that have grown over many years.

🚁 Building where access is a challenge.Due to the demanding terrain and limited accessibility of the Patrullarve constru...
06/10/2026

🚁 Building where access is a challenge.

Due to the demanding terrain and limited accessibility of the Patrullarve construction site in Zermatt, heavy components have to take to the skies. 🏔️

For the components of the installation’s 16 towers alone, around 100 helicopter flights are required. 🚁⚙️

A construction process that requires precise planning, teamwork and coordination – on the ground and in the air. 👷‍♂️🤝


Matterhorn Zermatt Bergbahnen

01/10/2026

👀🪢 POV: You’re right in the middle of a rope splice.

Two rope ends become one continuous loop. 🔗

Using a special splicing needle, the tapered ends are carefully worked into the core of the opposite rope section. Step by step, the connection disappears inside the rope, creating a seamless splice that can run smoothly through the entire ropeway system. 🚡⚙️

Once complete, the rope is lifted back onto the towers, brought to its nominal tension and carefully checked. 🔍

Rope splicing up close at the new GD10 Helmissimo. 💪🏔️
3 Zinnen Dolomites​

🔗 One rope. 86.6 tonnes. One continuous loop.The new GD10 Helmissimo puts some impressive numbers into motion. 🚡⚙️🔹 Rope...
29/09/2026

🔗 One rope. 86.6 tonnes. One continuous loop.

The new GD10 Helmissimo puts some impressive numbers into motion. 🚡⚙️

🔹 Rope length: 3.1× the ride length
🔹 Rope weight: 14 kg/m
🔹 Total rope weight: 86.6 tonnes

The final connection? Rope splicing – joining both ends to create one continuous rope loop. A process that requires experience, teamwork and absolute precision. 💪

Engineering on a whole different scale. 🏔️

🔧 Maintenance made safer, simpler and more efficient with ROPERA.Every detail is designed with maintenance teams in mind...
24/09/2026

🔧 Maintenance made safer, simpler and more efficient with ROPERA.

Every detail is designed with maintenance teams in mind:

✔️ 750 mm walkways – the widest on the market – for greater safety and comfort
✔️ Full visibility of synchronization elements behind plexiglass for safer inspections
✔️ Fewer manual steps for easier and more efficient maintenance
✔️ Openable walkways for direct access to every component
✔️ Easily accessible safety systems
✔️ Proven know-how from 5,000+ installations worldwide, built into every detail

More accessibility. Greater safety. Easier maintenance. ⚙️

🔷 ROPERA – The New Era of Ropeways.

Discover more on our website – link in bio.

🚠 Construction is progressing steadily at Latemar Dolomites!The installation of the towers and station components for th...
22/09/2026

🚠 Construction is progressing steadily at Latemar Dolomites!

The installation of the towers and station components for the new 8-seater “Obereggen” chairlift is well underway. 🏗️⛰️

Once completed, the new LEITNER system will enhance guest comfort and increase transport capacity, further strengthening the connection between Obereggen, Pampeago and Predazzo. ❄️🚡

We are proud to support Latemar Dolomites with a modern ropeway solution designed for efficiency, reliability and an improved mountain experience. 🙌🏔️

Latemar Dolomites​ Eisath​

17/09/2026

🚠 Every successful ropeway project starts long before the installation itself.

For the Patrullarve CD6C chairlift in Zermatt, tower sections are carefully prepared and pre-assembled before being transported by helicopter to their final locations. 🚁🏔️

In this teaser, Gerald Senn, Building Site Manager at LEITNER, takes us behind the scenes and explains the process behind this crucial construction phase. ⚙️👷

🎬 Discover the full story tomorrow!


Zermatt Bergbahnen AG

🚠📉 Lower costs. Less downtime. Smarter maintenance.The strength of ROPERA lies in its simplicity.✔️ Durable components f...
15/09/2026

🚠📉 Lower costs. Less downtime. Smarter maintenance.

The strength of ROPERA lies in its simplicity.

✔️ Durable components for maximum longevity
✔️ Extended maintenance intervals
✔️ Predictive maintenance for higher availability
✔️ Fewer rollers and spare parts on the line
✔️ Reduced life-cycle costs over the entire lifespan

More uptime. Less effort. Greater efficiency.

🔷 ROPERA – The New Era of Ropeways. Discover more on our website!
https://www.leitner.com/ropera/

Indirizzo

Brennerstraße 34
Vipiteno
39049

Orario di apertura

Lunedì 08:00 - 17:00
Martedì 08:00 - 17:00
Mercoledì 08:00 - 17:00
Giovedì 08:00 - 17:00
Venerdì 08:00 - 17:00

Telefono

+39 0472 722 111

Notifiche

Lascia la tua email e sarai tra i primi a sapere quando LEITNER pubblica novità e promozioni. Il tuo indirizzo email non verrà utilizzato per nessun altro scopo e potrai annullare l'iscrizione in qualsiasi momento.

Contatta L'azienda

Invia un messaggio a LEITNER:

Scelte rapide

Condividi