Enerray SpA

Enerray SpA Enerray S.p.A. official page. Leader in design, development and management of medium and large photo

Enerray S.p.A. - founded in 2007 and entirely controlled by Seci Energia, Gruppo Industriale Maccaferri – is leader in the design, development and management of small, medium and large photovoltaic systems. Enerray’s services are based on a well-established and continuously growing experience, acquired on more than 200 installed plants with a total power of about 178 MW. This growth since it was f

irst established supports the company’s status as a reference point in its business sector. Enerray’s strong know-how and association with a major industrial group, with more than a 130-year history and 53 production plants, confirms Enerray as a reliable technological partner from a project’s bankability perspective. Enerray operates in Italy and in several countries in the Middle East and Eastern Europe.

Monday good news 😀The   parks of “Arinna”, “Winnergy” and now 👉“ARC”, part of the   in  , have successfully passed all t...
11/11/2019

Monday good news 😀
The parks of “Arinna”, “Winnergy” and now 👉“ARC”, part of the in , have successfully passed all the phases envisaged by the Power Purchase Agreement (PPA):
– Mechanical Completion Test
– Commissioning and Testing
– Grid Compliance Test
– Performance Test
thus achieving the commercial operation (COD). Starting from September 8th (for Arinna and Winnergy) and November 3rd (for ARC), the three are feeding energy into the Egyptian electricity grid and this energy will be paid according to the agreements of the PPA.
☀️ https://www.enerray.com/media-room/news/cod-photovoltaic-parks-arinna-winnergy-egypt/

Siamo lieti di annunciare che i due   denominati “Arinna” e “Winnergy”, facenti parte del   in Egitto hanno superato con...
22/10/2019

Siamo lieti di annunciare che i due denominati “Arinna” e “Winnergy”, facenti parte del in Egitto hanno superato con successo tutte le fasi previste dal Power Purchase Agreement (PPA) 🌳
– Mechanical Completion Test
– Commissioning and Testing
– Grid Compliance Test
– Performance Test
ottenendo in questo modo l’attivazione commerciale (COD) ☀️ Un risultato ottenuto grazie alla professionalità e allo sforzo congiunto, profuso negli ultimi mesi, da parte del Team di , e dei partner locali.
👉

I parchi fotovoltaici “Arinna” e “Winnergy” in Egitto hanno superato con successo tutte le fasi previste dal Power Purchase Agreement (PPA), ottenendo in questo modo l'attivazione commerciale (COD).

The   of the   fires could also contribute to   and, in the long-term, scientists have told the BBC the fires could make...
13/09/2019

The of the fires could also contribute to and, in the long-term, scientists have told the BBC the fires could make the Paris climate target more difficult to achieve. As we are very worried about that but we are increasingly motivated to make concrete efforts in regards to ethics and the , not only by producing clean, , but also by carrying out its business in accordance with current laws and in compliance with high ethical standards 🌳
👉 https://www.enerray.com/solar-energy/environmental-protection/

Grazie ai continui investimenti effettuati negli anni e all’esperienza e competenza dei nostri ingegneri e tecnici fidel...
02/09/2019

Grazie ai continui investimenti effettuati negli anni e all’esperienza e competenza dei nostri ingegneri e tecnici fidelizzati, continuiamo a primeggiare nel settore dell’O&M . L’implementazione di attività di manutenzione ordinarie e preventiva mirate ha ridotto notevolmente le possibilità di guasto e le perdite di produzione sugli . Ciò è stato possibile grazie al track record acquisito negli anni che ha permesso ai tecnici della control room di avere uno storico dei guasti per effettuare analisi predittive.
👇
https://www.enerray.com/it/media-room/news/statistiche-dipartimento-om-fotovoltaico-primo-semestre-2019/

Enerray and TerniEnergia are proud to announce the lacing of the first photovoltaic park in  , in Tozeur. The   has a to...
29/08/2019

Enerray and TerniEnergia are proud to announce the lacing of the first photovoltaic park in , in Tozeur. The has a total capacity of 10 mwp and occupies about 20 hectares of land.
Enerray is the of the consortium that completed the work,
☀️ over 31.000 photovoltaic modules with glass-glass Technology.
⚡️ estimated 17,4 gwh / year.
🌳 equivalent co2 saving of about 7.500 tons every year.

👉 https://www.enerray.com/it/media-room/news/realizzazione-impianto-fotovoltaico-tozeur-tunisia/

Enerray e TerniEnergia sono orgogliose di annunciare l’allaccio del primo parco fotovoltaico in , a Tozeur. Il ha una capacità complessiva pari a 10 MWp e occupa circa 20 ettari di terreno.
Enerray è l’Epc del Consorzio che ha completato i lavori,
☀️ Oltre 31.000 moduli fotovoltaici con tecnologia glass-glass.
⚡️Producibilità stimata pari a 17,4 GWh/anno.
🌳Risparmio equivalente di CO2 pari a circa 7.500 tonnellate ogni anno.

👉 https://www.enerray.com/it/media-room/news/realizzazione-impianto-fotovoltaico-tozeur-tunisia/

Our   ☀️📌 Falcon - Ma'an (Jordan)💪 Power: 23,100 kWp⚡️ Yearly produced energy: 46,893,000 kWh🌳 Avoided CO2: 24,943,000 K...
26/08/2019

Our ☀️
📌 Falcon - Ma'an (Jordan)
💪 Power: 23,100 kWp
⚡️ Yearly produced energy: 46,893,000 kWh
🌳 Avoided CO2: 24,943,000 Kg/year
👉 Discover our top Projects: http://bit.ly/2uPsmms

Renewable energy is the future 🌳Walk the path with Enerray SpA
05/08/2019

Renewable energy is the future 🌳
Walk the path with Enerray SpA

 , a consortium formed by Enerray SpA and   SpA, has awarded, in April 2019, the construction of a   plant on the Syndia...
30/07/2019

, a consortium formed by Enerray SpA and SpA, has awarded, in April 2019, the construction of a plant on the Syndial field – ’s environmental company – in Porto Torres (SS), Italy 🇮🇹
The system, currently under construction, will have a power of 14 MWp ⚡️ , with a production capacity of approximately 23,382 MWh/year and a saving of CO2 equal to 11,700 kg / year 🌳
👉 http://bit.ly/2KfXtPc

The Company formed by Enerray (Maccaferri Industrial Group) and Imesa is building a photovoltaic park for Eni to service the site of national interest of Porto Torres.

The amount of electricity generated by a solar   plant depends on some factors, such as PV panel technology, dimensions,...
23/07/2019

The amount of electricity generated by a solar plant depends on some factors, such as PV panel technology, dimensions, type of installation, position, location and weather conditions.
👉 https://www.enerray.com/blog/solar-photovoltaic-panel-energy-efficiency-and-production/

The amount of energy generated by a solar PV panel depends on some factors, such as PV technology, dimension, type of installation, position, location and metereological conditions.

Indirizzo

Via J. F. Kennedy 10
Zola Predosa
40069

Notifiche

Lasciando la tua email puoi essere il primo a sapere quando Enerray SpA pubblica notizie e promozioni. Il tuo indirizzo email non verrà utilizzato per nessun altro scopo e potrai annullare l'iscrizione in qualsiasi momento.

Contatta L'azienda

Invia un messaggio a Enerray SpA:

In evidenza

Condividi