When building for diaspora clients, we don’t leave quality to chance.
We insist on full contracts that allow us to control materials, workmanship, and cost outcomes.
In this project, machine-crushed ballast met the specs but distance and logistics were inflating costs.
So we went straight to the quarry, inspected hand-crushed ballast, confirmed sizing with the structural engineer, and approved it for use.
Result?
✅Structural integrity maintained
✅Engineer-approved materials
✅Ksh. 8,200 saved per truck
Because real cost overruns don’t start on site.
They start during planning, material selection, and poor decision-making on paper.