A). PHASE 1. LICENSES / PERMITS
Before drilling you need a Water Resources Management Authority (WRMA) Authorization & a NEMA licence/permit.
-WRMA abstraction permit is obtained after we carry out a successful Hydro-geological & Geophysical Survey for the proposed borehole site; take the reports to WRMA for approval and issuance of the permit. Total cost is Ksh.55,000
-NEMA permit is obtained after we carry out a successful Environmental Impact Assessments (EIA) for the proposed site and take the reports (11 copies) to NEMA for approval. Total cost is Ksh.50,000. Total Phase 1=Ksh.105,000
Some little transport charges will be added for sites that are too far from Nairobi.
Days to complete and get the permits –approximately 21 working days.
B). PHASE 2. ACTUAL DRILLING.
Charges per metre is Ksh.6,450 in Nairobi and its environs. Drilling charges outside Nairobi will be over Ksh.6,450/- . Kindly note Drilling cost changes with site location across Kenya.
Days to complete- Drills approximately 100-150metres per day
Across Kenya most drill depths ranges from 150m to 350m.
Note: Borehole drilling includes drilling the borehole with 8" drill bit, installing plain and slotted 4mm thick steel casings, inserting of gravel pack, borehole development(flushing) for about 4 hrs, 24-hr test pumping and chemical analysis.
C). PHASE 3. PUMP INSTALLATIONS & other connections.
This depends on amount of water (Q) to be pumped and borehole depth (H). The deeper the borehole, the bigger the pump required the more the cost and vice-versa. Total cost for the pump supply, installations and other accessories ranges between Ksh 300,000 and Ksh 1,000,000
NB: Submersible Pumps can be Electric, Solar ,Generator or Handpump.
Days to complete- approximately 5 days
All prices are inclusive of VAT