27/04/2026
A scalable 50kw system meant to power a critical facility.
P.V power takes presidence always in this system.
This system intergrates into the existing power supply options which include the grid and two DGs.
A customised control panel was designed on site to ensure seamless transitions of power(not even a single flickering on loads) on need basis.
Since installation in august 2025, there has been significant cost of power averaging at 45% in comparison to the last 2 years.
is capable of walking a similarjourney to deliver energy solutions that are guaranteed to make financial sense as well as stability of power.