Dynamic Engineering Steels-DES

Dynamic Engineering Steels-DES Engineering Service

 ---------------------Problem:- Need a tower for decoration at front gate.Solution:- Design and build the gate tower.Dim...
26/10/2025


---------------------
Problem:
- Need a tower for decoration at front gate.
Solution:
- Design and build the gate tower.
Dimension:
- Structure's width = 2.25 m
- Structure's height = 14.5 m
- Structure's depth = 2.25 m
Project Timeline:
- 6 weeks after purchasing order (PO).
---------------------

25/10/2025


--
Test and operate hitch lift.
ការតេស្ត និងប្រើប្រាស់ hitch lift.
--

 ---------------------Problem:- Need to add hand valves for machine pipes.Solution:- Weld new SUS304 hand valves to mach...
24/10/2025


---------------------
Problem:
- Need to add hand valves for machine pipes.
Solution:
- Weld new SUS304 hand valves to machine pipes.
Project Timeline:
- 4 weeks after purchasing order (PO).
---------------------

 ---------------------Problem:- Need custom cabinets to store firefighter gear.Solution:- Design and build the cabinets....
23/10/2025


---------------------
Problem:
- Need custom cabinets to store firefighter gear.
Solution:
- Design and build the cabinets.
Dimension:
- Structure's width = 0.6 m
- Structure's height = 1.8 m
- Structure's depth = 0.55 m
Project Timeline:
- 4 weeks after purchasing order (PO).
---------------------

22/10/2025


--
Model 3D of the transplanting machine from exiting product.
បង្កើត 3D នៃម៉ាស៊ីនដាំកូនស្រូវពីម៉ាស៊ីនដែលមានស្រាប់.
--

 ---------------------Problem:- Need a hitch lift to transfer a heavy tank onto the car.Solution:- Design and build the ...
21/10/2025


---------------------
Problem:
- Need a hitch lift to transfer a heavy tank onto the car.
Solution:
- Design and build the hitch lift.
Dimension:
- Structure's width = 1.37 m
- Structure's height = 0.7 m
- Structure's depth = 1.6 m
Project Timeline:
- 6 weeks after purchasing order (PO).
---------------------

18/10/2025

30 tons
30 tons
--
Test system at site.
ការតេស្តប្រព័ន្ធទាំងមូលនៅការដ្ឋាន.
--

 ---------------------Problem:- Need to install mechanical and structure of primary clarifier for waste water treatment ...
18/10/2025


---------------------
Problem:
- Need to install mechanical and structure of primary clarifier for waste water treatment plant.
Solution:
- Design the mechanical and structure of primary clarifier.
Dimension:
- Structure's diameter = 1.2 m
- Structure's height = 5 m
Project Timeline:
- 8 weeks after purchasing order (PO).
---------------------

Address

Phnom Penh
855

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 00:00

Website

Alerts

Be the first to know and let us send you an email when Dynamic Engineering Steels-DES posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Dynamic Engineering Steels-DES:

Share