Tandem lifts are won in the planning phase.
Before mobilization, our Engineering Department prepares:
- load calculations and crane configuration
- lift sequence and synchronization plan
- rigging concept and load path
- step-by-step lifting procedure
- safety and exclusion zones
This reduces on-site uncertainty and keeps schedules under control.