Sheng Jian Engineering & Construction Sdn Bhd

Call Directions Website Contact the business

Sheng Jian Engineering & Construction Sdn Bhd Trusted by Malaysia's industries for more than two decades. The engineering partner you can rely on.

Sheng Jian Engineering & Construction Sdn Bhd (Company No. 200301008291 / 610711-H) is a premier Malaysian engineering solutions provider established in 2000 in Ipoh. With over 20 years of expertise and 900+ completed projects, we deliver innovative steel fabrication and comprehensive engineering solutions that meet the highest standards of quality and reliability. Our commitment to Industry 4.0, sustainable engineering, and alignment with Malaysia’s Shared Prosperity Vision 2030 drives us to exceed every project demand. Our core services include:

· Structural Steel Fabrication
· Bulk Material Handling Systems
· Storage Tanks & Tank Farms
· Industrial Construction & Factory Building
· Piping Fabrication & Installation
· Industrial Project Management
· And More – Tailored solutions to address your unique engineering and fabrication needs.

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐓𝐑𝐀𝐍𝐒𝐅𝐄𝐑 𝐏𝐎𝐈𝐍𝐓The transfer point is where multiple installed components finally have to work as on...
05/10/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐓𝐑𝐀𝐍𝐒𝐅𝐄𝐑 𝐏𝐎𝐈𝐍𝐓

The transfer point is where multiple installed components finally have to work as one system.

SJEC checked the chute, belt and supporting structure together, making local adjustments to maintain a clear and consistent material path.

With the interface set, finishing work could continue around the structure.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐄𝐋𝐄𝐕𝐀𝐓𝐄𝐃 𝐈𝐍𝐓𝐄𝐑𝐅𝐀𝐂𝐄 𝐖𝐎𝐑𝐊Not every connection can be completed from ground level.The crew accessed t...
04/10/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐄𝐋𝐄𝐕𝐀𝐓𝐄𝐃 𝐈𝐍𝐓𝐄𝐑𝐅𝐀𝐂𝐄 𝐖𝐎𝐑𝐊

Not every connection can be completed from ground level.

The crew accessed the upper transfer section to complete fit-up and adjustments where the chute meets the surrounding material-handling equipment.

Working in tighter areas requires the installation sequence to be carefully coordinated.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐂𝐇𝐔𝐓𝐄 𝐅𝐀𝐁𝐑𝐈𝐂𝐀𝐓𝐈𝐎𝐍Once the chute position was confirmed, final plate fit-up could begin.Our team ca...
03/10/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐂𝐇𝐔𝐓𝐄 𝐅𝐀𝐁𝐑𝐈𝐂𝐀𝐓𝐈𝐎𝐍

Once the chute position was confirmed, final plate fit-up could begin.

Our team carried out local fabrication and welding around the transfer opening, shaping the connection to suit the actual installed geometry.

Up next: continuing the same work across the elevated sections.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐂𝐇𝐔𝐓𝐄 𝐂𝐎𝐍𝐍𝐄𝐂𝐓𝐈𝐎𝐍The material path was extended from the Cooling Bin discharge towards the receivin...
02/10/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐂𝐇𝐔𝐓𝐄 𝐂𝐎𝐍𝐍𝐄𝐂𝐓𝐈𝐎𝐍

The material path was extended from the Cooling Bin discharge towards the receiving conveyor.

The chute interface was positioned over the belt and checked against the surrounding frame before permanent finishing.

This transition helps direct material from one section to the next.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐂𝐋𝐄𝐀𝐑𝐀𝐍𝐂𝐄 𝐂𝐇𝐄𝐂𝐊Large equipment, concrete supports and moving machinery all share a compact install...
01/10/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐂𝐋𝐄𝐀𝐑𝐀𝐍𝐂𝐄 𝐂𝐇𝐄𝐂𝐊

Large equipment, concrete supports and moving machinery all share a compact installation area here.

Before finalising each connection, SJEC checked the available clearances around the conveyor structure and supporting pedestals.

This ensures the mechanical system has the space required for operation and future access.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐃𝐈𝐒𝐂𝐇𝐀𝐑𝐆𝐄 𝐂𝐎𝐍𝐓𝐑𝐎𝐋The discharge section includes more than the conveyor itself.Actuator and gate as...
30/09/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐃𝐈𝐒𝐂𝐇𝐀𝐑𝐆𝐄 𝐂𝐎𝐍𝐓𝐑𝐎𝐋

The discharge section includes more than the conveyor itself.

Actuator and gate assemblies were fitted along the lower portion of the bin so material flow can be controlled as it moves towards the conveyor.

Once positioned, these assemblies had to be checked against the surrounding frame and belt line.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐁𝐄𝐋𝐓 𝐀𝐋𝐈𝐆𝐍𝐌𝐄𝐍𝐓A conveyor performs properly only when the belt, rollers and support structure work ...
29/09/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐁𝐄𝐋𝐓 𝐀𝐋𝐈𝐆𝐍𝐌𝐄𝐍𝐓

A conveyor performs properly only when the belt, rollers and support structure work on the same path.

SJEC continued fine adjustment along the conveyor line, checking clearances around the discharge assemblies and surrounding structural members.

The next stage focuses on the mechanisms controlling material release.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐁𝐄𝐋𝐓 𝐂𝐎𝐍𝐕𝐄𝐘𝐎𝐑 𝐖𝐎𝐑𝐊𝐒Attention now turned to the belt conveyor directly beneath the bin outlets.Our ...
28/09/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐁𝐄𝐋𝐓 𝐂𝐎𝐍𝐕𝐄𝐘𝐎𝐑 𝐖𝐎𝐑𝐊𝐒

Attention now turned to the belt conveyor directly beneath the bin outlets.

Our crew worked around the rollers, belt and supporting frame to establish the correct transfer path and prepare the system for connection with the discharge chute.

Up next: detailed belt and frame alignment.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐎𝐍-𝐒𝐈𝐓𝐄 𝐅𝐈𝐓-𝐔𝐏The next phase focused on fitting the surrounding steelwork around the installed bin...
27/09/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐎𝐍-𝐒𝐈𝐓𝐄 𝐅𝐈𝐓-𝐔𝐏

The next phase focused on fitting the surrounding steelwork around the installed bins and conveyor system.

Measurements, tack welding and local adjustments were completed directly on site so each connection matched the as-installed condition.

From here, work moved closer to the actual belt line.

👉 www.sjec.com.my

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐒𝐓𝐄𝐄𝐋𝐖𝐎𝐑𝐊 𝐏𝐑𝐄𝐏𝐀𝐑𝐀𝐓𝐈𝐎𝐍As the conveyor layout became fixed, additional steel pieces were prepared fo...
26/09/2026

𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐈𝐍𝐒𝐓𝐀𝐋𝐋𝐀𝐓𝐈𝐎𝐍: 𝐒𝐓𝐄𝐄𝐋𝐖𝐎𝐑𝐊 𝐏𝐑𝐄𝐏𝐀𝐑𝐀𝐓𝐈𝐎𝐍

As the conveyor layout became fixed, additional steel pieces were prepared for supports, interfaces and local modifications.

Site installation often requires final dimensions to be confirmed against the actual equipment before fabrication is completed.

Those pieces would now be fitted directly into the system.

👉 www.sjec.com.my

Address

53A, Tasek Mutiara 1, Taman Tasek Jaya
Ipoh
31400

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 17:00

Telephone

+60125966228

Alerts

Be the first to know and let us send you an email when Sheng Jian Engineering & Construction Sdn Bhd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Sheng Jian Engineering & Construction Sdn Bhd:

Shortcuts

Share