HTS Engineering And Consultancy Services Sdn Bhd

Directions Website

HTS Engineering And Consultancy Services Sdn Bhd Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from HTS Engineering And Consultancy Services Sdn Bhd, Science, Technology & Engineering, 1-23-5, Menara Bangkok Bank, Berjaya Central Park, Jalan Ampang, Kuala Lumpur.
(2)

ENGLISHRFP NOTICE — SUBMISSION PERIOD CLOSEDThe tender for the takeover of operations of the Indoor Vertical Farm in Isk...
03/10/2026

ENGLISH
RFP NOTICE — SUBMISSION PERIOD CLOSED
The tender for the takeover of operations of the Indoor Vertical Farm in Iskandar Puteri, Johor closed at 5:00 PM MYT on 3 October 2026. Late submissions will not be considered.
Thank you to all interested parties. Enquiries: [email protected] | WhatsApp +6016-364 6453.

BAHASA MELAYU
NOTIS RFP — TEMPOH PENGHANTARAN DITUTUP
Tender pengambilalihan operasi Indoor Vertical Farm di Iskandar Puteri, Johor ditutup pada 5:00 petang MYT, 3 Oktober 2026. Cadangan lewat tidak akan dipertimbangkan.
Terima kasih kepada semua pihak yang berminat. Pertanyaan: [email protected] | WhatsApp +6016-364 6453.

Hospital power failure: two scenarios, two different responsesA building-wide utility outage and a local electrical trip...
26/09/2026

Hospital power failure: two scenarios, two different responses
A building-wide utility outage and a local electrical trip are not the same event. Knowing the difference matters for hospital safety and continuity of care.
1. Building-wide loss of TNB supply

When utility power fails, the AMF (Automatic Mains Failure) board detects the loss and initiates the standby generator sequence. Once supply is transferred through the EMSB (Essential Main Switchboard), designated essential services—such as operating theatres, ICU ventilation, emergency lighting, fire systems, and nurse call—can be supported by the generator.
If the standby generator is unavailable, a portable or mobile generator may be connected at the designated EMSB tapping point by authorized electrical personnel, following the hospital’s approved procedures.
2. Local trip in a floor, wing, or department

A local trip may affect only one distribution board or circuit while the rest of the hospital remains powered. It does not normally start the building standby generator automatically. That makes local alarms and monitoring especially important.
For example, a blood-bank temperature alarm should alert the responsible team if cooling is affected. An operating-theatre UPS alarm should alert staff if the UPS is not charging or has a supply problem. Critical-area alarms should reach the appropriate facilities response team promptly.
Key takeaway: A building-wide utility failure prompts the generator sequence. A local trip may not. Reliable area-level alarms, monitoring, and tested response procedures help prevent a hidden power problem from becoming a patient-care or equipment risk.
The visual is an illustrative simulation, not a diagnosis of a specific installation. Switchgear arrangements and protection behavior vary by site. Do not open energized equipment; inspection and switching must be performed by authorized personnel under facility safety procedures.

PC isn’t the finish line—it may be your clearest next step.In an MSQH gap analysis, each applicable element is scored SC...
26/09/2026

PC isn’t the finish line—it may be your clearest next step.

In an MSQH gap analysis, each applicable element is scored SC (Substantially Compliant), PC (Partially Compliant), NC (Non-Compliant) or NA (Not Applicable).

Your compliance percentage is:

Total SC ÷ total applicable criteria × 100%

For example, with 50 applicable criteria—10 SC, 30 PC and 10 NC—you’re at 20%. To reach 60%, you need 30 SC in total, so 20 PC items must move to SC (assuming the applicable-criteria denominator stays the same).

Where to focus?

Progress gaps NC → PC → SC.

Sequence the work by risk: assess consequence and likelihood, not convenience.

Track the trajectory between review rounds, not only the final score.

Give focused attention to the 17 Special Requirements—including areas such as building, mechanical systems, indoor air quality, medical gas, vertical transport, water supply and electrical systems.

Score honestly and review on a fixed cycle until gaps are closed.

Which gap will you move forward first?

Reference baseline: MSQH 6th Edition (2021). Confirm applicability and scoring against the relevant standard and survey guidance.

Effective maintenance means doing the right things: the equipment delivers the required result. For a chiller, that mean...
26/09/2026

Effective maintenance means doing the right things: the equipment delivers the required result. For a chiller, that means producing water at the specified temperature.

Efficient maintenance means doing things right: meeting that standard while using resources wisely. Think power, materials, and manpower—and, in practice, the cost of achieving the required maintenance standard.

One hospital may spend less per square foot on maintenance than another. If both meet the required standard, the lower cost per square foot points to greater efficiency. But low cost alone is not enough if the equipment fails to deliver.

First make sure the work is effective. Then improve how efficiently it is done.

How does your team balance reliability, service standards, and maintenance cost?

🌱 PELUANG PERNIAGAAN — Ladang Vertikal Dalaman, Iskandar Puteri Kemudahan ladang vertikal yang lengkap dan sedang berope...
20/09/2026

🌱 PELUANG PERNIAGAAN — Ladang Vertikal Dalaman, Iskandar Puteri Kemudahan ladang vertikal yang lengkap dan sedang beroperasi dibuka untuk pengambilalihan — 6 bilik penanaman, 753 modul, kawalan PLC, persekitaran terkawal (sesuai untuk industri Bilik Bersih ISO Kelas 8). 📊 Kapasiti 300–800 kg/hari 📄 Tempoh tender: 19 Sept – 3 Okt 2026 💰 Dokumen RFP: RM300 (tidak akan dikembalikan) 🔍 Lawatan tapak dengan temu janji 📧 [email protected] | WhatsApp: wa.me/60163646453

🌱 BUSINESS OPPORTUNITY — Indoor Vertical Farm, Iskandar PuteriA fully equipped, operational vertical farm is open for ta...
20/09/2026

🌱 BUSINESS OPPORTUNITY — Indoor Vertical Farm, Iskandar Puteri
A fully equipped, operational vertical farm is open for takeover — 6 grow rooms, 753 modules, PLC-controlled, clean-room-grade environment (suitable for ISO Class 8 industries: pharma, electronics, medical devices).
📊 300–800 kg/day capacity
📄 RFP open: 19 Sept – 3 Oct 2026
💰 RFP document: RM300 (non-refundable)
🔍 Site visit by appointment
📧 [email protected] | WhatsApp: wa.me/60163646453

Closing the windows during jerebu does not automatically make the air inside your building safe. This week, many distric...
18/09/2026

Closing the windows during jerebu does not automatically make the air inside your building safe.

This week, many districts in Peninsular Malaysia recorded unhealthy API readings. Fine haze particles can still enter through door gaps, lift lobbies, and fresh-air intakes on AHUs. In offices and condos that recirculate air on dirty filters, occupants sit in a sealed mix of outdoor PM2.5 and rising indoor CO₂.

Treat filters as an IAQ control, not just a comfort item.
During unhealthy API days:
1. keep openings closed where practical
2. run ACMV on recirculation if the system allows
3. inspect AHU/FCU filters more often and
4. use portable HEPA units in occupied rooms

Fresh-air strategy should be reviewed with your FM team and any occupancy-specific IAQ expectations confirmed with the relevant authority, not assumed from last year’s servicing report.

Follow HTS Engineering for practical FM notes whenever the weather — or the API — turns.

30/08/2026

Selamat Hari Merdeka ke - 69 🇲🇾🎆

Extra Merdeka banners are fine. Blocking the hose reel “just for the weekend” is not. A common building problem every fe...
29/08/2026

Extra Merdeka banners are fine. Blocking the hose reel “just for the weekend” is not. A common building problem every festive period: lobbies fill with stage props, flags and pop-up counters. Escape routes shrink, fire doors get wedged open for convenience, and portable extinguishers disappear behind décor. For designated premises, Bomba still expects a valid Fire Certificate, clear means of escape under UBBL, and equipment that can be reached in seconds — a long weekend does not pause that duty. The fix is unglamorous and effective: walk every exit, stair, riser cupboard and assembly point before the public arrives; brief security and event vendors on what must stay clear; put temporary items on a marked plan, not against a fire-rated door. Confirm site-specific requirements with JBPM/Bomba or your competent person — this is general guidance, not a certificate audit.
Like the HTS Engineering page if your committee wants fire-safety reminders that respect how buildings actually operate.

HTS Engineering is now collaborating with Akademi Binaan Malaysia (ABM) Wilayah Tengah to grow more of these professiona...
29/08/2026

HTS Engineering is now collaborating with Akademi Binaan Malaysia (ABM) Wilayah Tengah to grow more of these professionals — and to raise awareness that critical FM practices are not support work. They are patient-safety and staff-safety work.

September 2026 intake for Certified Healthcare Facility Management (CHFM) is open.

15-day hybrid programme. Industry-recognised certificate. CIDB-approved. HRD Corp claimable.

Merdeka promotional fee: RM5,000 (including SST).
If you are a Facility Manager, Healthcare Engineer, Hospital Administrator or Biomedical Engineer — or you employ them — this is the moment to raise the standard.

WhatsApp Admin: +6016-364 6453

Puan Salmi (ABM Wilayah Tengah): 011-2361 7404

Email: [email protected]
Seats are limited. Register before the promotional window closes.

HTSE is a leading engineering & business consultant. Licensed as a training provider by the Construction Industry Development Board of Malaysia (CIDB), we have over 20 years of experience in engineering and healthcare projects. We offer consultancy services and tailored training programs to support....

Address

1-23-5, Menara Bangkok Bank, Berjaya Central Park, Jalan Ampang
Kuala Lumpur
50450

Alerts

Be the first to know and let us send you an email when HTS Engineering And Consultancy Services Sdn Bhd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Nearby engineering companies