11/03/2026
A tragic accident at a construction site at SK Sageng, Simunjan on 27 Feb 2026 is a powerful reminder: construction methods must evolve with safety in mind.
Traditional kentledge pile load tests require stacking massive concrete blocks to create test loads — introducing significant safety risks and large working footprints on site.
Bidirectional Pile Load Test (O-Cell Method) eliminates these heavy kentledge blocks by generating load within the pile itself.
✔ No massive concrete stacking
✔ Reduced site risk
✔ Faster and more efficient testing
✔ Reliable measurement of pile capacity
Safer technology exists. The industry should start using it.