07/10/2026
🏗️ JKR SARAWAK SET TO ACHIEVE ANOTHER ENGINEERING RECORD!
Another milestone is taking shape in Sarawak. đź’Ş
The Elevated Road Teku–Pasai Siong to Kemuyang is set to feature a remarkable 700-metre segmental arch bridge, showcasing engineering innovation in the delivery of Sarawak’s infrastructure.
Upon completion, the structure is poised to be recognised as Southeast Asia’s Longest Segmental Arch Bridge — another engineering achievement for JKR Sarawak and Sarawak. 🏆
From ambitious designs to engineering reality, we continue to push boundaries and build infrastructure that will serve generations to come.