LKS Envirotech Sdn. Bhd.

Directions Website

LKS Envirotech Sdn. Bhd. Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from LKS Envirotech Sdn. Bhd., Industrial Company, Lot 38, 1st Floor, Block V, Lorong Avenue 2, Bandar Utama, Mile 6, North Road, Sandakan.

Providing complete composting solutions, BACKHUS compost turners, environmental consultancy, agricultural equipment, and technical support for the palm oil industry throughout Malaysia.

05/10/2026

Managing EFB composting plant

A short introduction on Empty Fruit Bunch (EFB) composting process with the use of BACKHUS turner machine and hose drum. The most efficient combination in EFB composting in producing high quality compost in shortest time and homogeneously spraying of pome onto the windrows as it turns. Please contact LKS ENVIROTECH SDN. BHD. or follow www.lkse.com.my for further information.

03/10/2026

German waste management delegation visit to Malaysia

The SBS & MGCC coordinated and organised a visit by 8 German companies on 21.9.26-25.9.26 to promote German technologies on waste treatment systems for Municipal Waste Management (MSW). Eggersmann was represented by Mr. Andreas and assisted by Mr. Lee Kok Seng from LKS ENVIROTECH SDN BHD.

The delegation had the opportunity to visit various factories and sites. In addition, the delegation had the opportunity to hear from authorities such as WMAM, SWCorp and KPKT on the current MSW status and future development.

The German delegation enjoyed local food from the famous street food and restaurants.

The visiting program has enabled Eggersmann and LKS to develop a marketing strategy to focus on MSW sector in Malaysia. A new business opportunity for LKS, besides palm oil industry sector.

27/09/2026

From production and assembly to Factory Acceptance Testing and final preparation for shipment — a look back at the journey of BACKHUS A65 1769 + HD90-20ME 1752 as it gets ready to begin its journey to Malaysia.

Part 5 Events leading To Shipment of BACKHUS A65 1769 + HD 90-20ME 1752To share the story of how the client made the dec...
27/09/2026

Part 5

Events leading To Shipment of BACKHUS A65 1769 + HD 90-20ME 1752

To share the story of how the client made the decision to purchase BACKHUS A65 and leading to shipment on coming 28.9.26:

- Client had previously purchased a BACKHUS 6.75 932 and HD90-20M in 2013
- After 13 years of using the BACKHUS 6.75 Machine , client is expanding its existing composting plant and the decision was made in December 2025 to invest in a 2nd unit Mechanical turner Machine. The prefered choice was a BACKHUS turner Machine. 💪
- EGGERSMANN/BACKHUS / LKS proven track record, parts availability , reliability, handles large volume, after sales service and incorporation of new technology (EMS & ETC) were the winning formula to secure the sales to client.
- Purchase order was given in February 2026 and progressive payment followed the assembly schedule, estimated time of 6-7 months for delivery ex-Germany.
- The Iran war in February 2026 appeared to threaten in the assembly of BACKHUS A65 but fortunately it has no disruption except for the delay in Special C4 paint work for the steel frame and the employees long summer July holiday .
- Week 36 all parts delivered to Wardenburg workshop for assembly .
- Week 38 completed and followed with Factory Assessment Test (FAT)
- 100% fully paid to Eggersmann before packing and shipment
- Week 39 preparation for transfer & delivery to Port Antwerp, Belgium, and the final port destination is Port Kota Kinabalu.
- 28.9.2026 is the beginning of sea voyage to Port Kota Kinabalu
- Keep watching for more news update .. 🙏 www.lkse.com.my

21/09/2026

Part 2 : The unstoppable & powerful BACKHUS A65 1769

The BACKHUS A65 1769 represents BACKHUS upper range high performance turner machine. It is designed for large scale turning performance for high volume composting operations.

And it is an unstoppable and powerful machine ready for FAT before being shipped out to Sabah, East Malaysia. It will join its sister machine BACKHUS 6.75 932, a 13-years old machine still in operation.

Watch the ease of closing the engine bonnet in which the platform makes it easy for technicians and operators to access the engine for maintenance and checking. 👇

20/09/2026

The title : Part 1 on!
Commencement of Factory Acceptance Test (FAT) on BACKHUS A65 1769 + HD90-20M

After 7 months wait, last week marked the most eagerly wait for commencement of Factory Assessment Test (FAT) for BACKHUS A65 1769 turner machine.

Let’s bring you to the most important test, the heart of the BACKHUS machine A65 1769, the Cummins engine with power of 354 kW/475 hp. It moves the machine with a weight of 23,000kg and provides a powerful turning capacity of 5,500m3/hr. Cummins has been the trusted & reliable engine for BACKHUS machine for more than 40 years.

You are about to witness the start of the BACKHUS 1769 Cummins engine on FAT at Wardeburg workshop , Germany… 👇Visit us a www.lkse.com.my for more.

LATEST NEWSLKS is pleased to share the good news that the BACKHUS A65 1769 is now completely built, constructed and test...
11/09/2026

LATEST NEWS

LKS is pleased to share the good news that the BACKHUS A65 1769 is now completely built, constructed and tested at Wardenburg’s workshop, Germany.

This amazing machine will perform a Factory Acceptance Test (FAT) on 14.9.26, often referred to as a factory assessment or evaluation test. It is a quality control procedure conducted at Wardenburg’s facility to verify that equipment or systems are built and operating according to design specifications before they are shipped.

We are waiting eagerly for its shipment & arrival to it final destination, Jambongan Island, Sabah, and deliver to its proud owner, Genting Plantations.

Please visit www.lkse.com.my for more details .

BACKHUS A*5 1776Another powerful BACKHUS A*5 1776 is coming its way to Johor, landing at Port Pasir Gudang sometime end ...
05/09/2026

BACKHUS A*5 1776

Another powerful BACKHUS A*5 1776 is coming its way to Johor, landing at Port Pasir Gudang sometime end of October 2026.

A glimpse of its assembly at BACKHUS Wardenburg workshop, week 36 has got all the major components ready for assembly on week 37.

This machine is for mineral blending purposes and not for any agricultural composting purposes. keep watching for amazing stories and follow the world’s leading mechanical BACKHUS turner machine … 💪🏿🙏

Address

Lot 38, 1st Floor, Block V, Lorong Avenue 2, Bandar Utama, Mile 6, North Road
Sandakan
90000

Opening Hours

Monday 08:00 - 05:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00

Alerts

Be the first to know and let us send you an email when LKS Envirotech Sdn. Bhd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share