Frontier Integrator

Frontier Integrator Single Source provider for vacuum, fan, blower and compression products, packaging, systems and solu

Renew our ISO 9001:2015 certification. Now to 2029
20/08/2026

Renew our ISO 9001:2015 certification.
Now to 2029

Day 2: Factory Acceptance Test & Discussion
28/07/2026

Day 2: Factory Acceptance Test & Discussion

Two (2) WITTIG ROW 40 G compressors have been delivered and are ready for operation.As gas injection compressor, they wi...
09/07/2026

Two (2) WITTIG ROW 40 G compressors have been delivered and are ready for operation.

As gas injection compressor, they will ensure stable pressure levels of up to 15 bar(a) within a regional gas network.

Welcome to contact us for inquiries within South East Asia

Another impressive delivery by our principal: FIMA www.fima.de Project details:One main air compressor and one start up ...
09/07/2026

Another impressive delivery by our principal: FIMA
www.fima.de

Project details:
One main air compressor and one start up air blower for sulphuric acid (H2SO4) plant.

Volume flow m³/h: 202,572
Pressure ratio: 1.747
Speed rpm: 4,455
Drive power kW: 4,629
Special feature: Steam turbine driven

Volume flow m³/h: 92,288
Speed rpm: 1785
Drive power kW: 1,100

19/06/2026
Two-Stage Recycle Gas Compressor for green diesel generation plant. Design and build by FIMA (www.fima.de)Volume flow: 1...
26/05/2026

Two-Stage Recycle Gas Compressor for green diesel generation plant.

Design and build by FIMA (www.fima.de)

Volume flow: 1662 m3/hr
Pressure Ratio: 1.296
Speed: 26454 RPM
Drive power: 1200 kW
Feature: Suction pressure control; API 617 Part 3

Selamat Hari Raya Haji. Semoga pengorbanan dan keinsafan pada hari ini membawa keberkatan dan kedamaian dalam hidup kita...
26/05/2026

Selamat Hari Raya Haji.
Semoga pengorbanan dan keinsafan pada hari ini membawa keberkatan dan kedamaian dalam hidup kita semua.

Testing & Commissioning + Training for Condenser Evacuation Exhaust Vacuum System in Power Plant.  All systems successfu...
22/05/2026

Testing & Commissioning + Training for Condenser Evacuation Exhaust Vacuum System in Power Plant. All systems successfully commissioned. Guys on the way back to Malaysia

Final performance test of the 2 stage compressor for Holborn Refinery in Hamburg by FIMA - first Green Diesel project in...
16/04/2026

Final performance test of the 2 stage compressor for Holborn Refinery in Hamburg by FIMA - first Green Diesel project in Europe.

www.fima.de

For similar project inquiry from South East Asia, please do contact us

Address

17 Jalan Anggerik Mokara 31/51, Kota Kemuning, Seksyen 31
Shah Alam
40460

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00

Telephone

+60-3-55258503

Alerts

Be the first to know and let us send you an email when Frontier Integrator posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Frontier Integrator:

Shortcuts

Share