Saager Aircool CC

Saager Aircool CC Saager Aircool CC is Namibia's leading HVAC service provider, offering a multitude of services that

08/05/2026
28 Curvent Fire King Type FK750S multipurpose roof ventilators installed at Furntech Fourways Solutions in Windhoek to a...
05/05/2026

28 Curvent Fire King Type FK750S multipurpose roof ventilators installed at Furntech Fourways Solutions in Windhoek to assist them in achieving their fire compliance.

A big thank you to our team who completed the installation in a professional and timely manner.

Thank you also to Starke Manufacturing and Airconditioning cc for the supply and delivery of the ventilators.

Another project done and dusted.This time, we were tasked by a private client with the design, supply and installation o...
01/04/2026

Another project done and dusted.

This time, we were tasked by a private client with the design, supply and installation of AC units, fresh air and extraction on two floors for the East Tower at the 4@Steps development in Kleine Kuppe.

With the assistance of our partners at Starke Manufacturing and Airconditioning cc, plans were drawn up, approved and professionally implemented and executed thanks to our outstanding team on side.

Final installation includes:
✅ 4 x Daikin VRV VI Loop outdoor units (heat recovery) powering a total of 36 indoor units on two floors;
✅ 2 x dedicated Daikin single split units for the server room;
✅ Fresh air and extraction ducting throughout.

A big thank you to the client for entrusting this project to us from start to finish. Many thanks also to all the other contractors involved for a smooth and hassle-free working environment.

We’re excited to share that we’ve successfully completed our scope of works for the Mega Centre revamp in Windhoek.Renov...
28/11/2025

We’re excited to share that we’ve successfully completed our scope of works for the Mega Centre revamp in Windhoek.

Renovation projects often come with their own challenges, but our team delivered all required installations on time and to the high standard our clients have come to expect.

Our primary scope included cooling a warehouse of over 3,400 m² for a major Namibian pharmaceutical company. We also installed air conditioning for all offices, three cold rooms, and handled both fresh-air supply and extraction.

Furthermore, we reinstalled two evaporative coolers with additional ducting, and completed the installation and commissioning of smoke-ventilation systems throughout the building.

In addition, we were responsible for installing air-conditioning systems for several line shops that will form part of the new shopping experience at Mega Centre.

Final installation included:
✅ 3 x Daikin Mini VRV systems, powering 23 indoor units
✅ 10 x New split unit installations of various capacities
✅ 15 x Reuse and reinstallation of existing split units
✅ 3 x Installation of new cold rooms
✅ 7 Installation of smoke fans, 6 of which we reused. Additionally, the installation of a new smoke board.
✅ Installation of fresh air and extraction systems throughout the building
✅ Reuse and reinstallation of two evap coolers with new and additional ducting

A very big thank you to the client Safland Property Group for entrusting us with these works.

Further gratitude goes out to main contractor Nexus Group of Companies for their support and teamwork during this time.

We would also like to thank our Mechanical Engineer Frikkie le Grange for his unconditional support throughout this project.

Last, but definitely not least, a big thanks to our suppliers:
Starke Manufacturing and Airconditioning cc
Yeti Cool Panels
Metraclark

We are super proud to have played our part in helping Model Namibia to bring their new flagship shop at the Auas Valley ...
20/10/2025

We are super proud to have played our part in helping Model Namibia to bring their new flagship shop at the Auas Valley Shopping Mall to life.

Over the last few months, our teams have been hard at work to make sure, that all clients have the most pleasant shopping experience possible.

Under the watchful eye of the engineering team from SCE Consulting Engineers, we were tasked with the installation of the following:

✅ 7 x Samsung DVMs II outdoor units, powering a total of
✅ 29 Samsung DVM 360 indoor cassette units
✅ All DVM's system wired to run over one centralised controller
✅ 6 x Samsung split units of various capacities
✅ A multitude of fresh air and extraction runs through the shop
✅ 6 x extraction canopies and their respective ducting for the kitchens, the biggest measuring 7000x2300
✅ Alterations and re-installation of smoke fans and dampers

We would like to thank Model and the entire O&L Group for once again putting their trust in us.

A special thank you also goes out to the professional team and the main contractor, Afrideca Construction Namibia (Pty) Ltd, without whom this would have not been such smooth sailing.

We would also like to extent our gratitute to all of our team members who have worked tirelessly to complete the job in time and to the highest standard.

Thank you also to our suppliers Fourways Group and Starke Manufacturing & Airconditioning CC

A few pictures depicting our progress at the alterations currently under at Mega Centre in Windhoek. About half of the t...
07/08/2025

A few pictures depicting our progress at the alterations currently under at Mega Centre in Windhoek. About half of the total area is being altered for a big pharmaceutical company, while the rest is set out to accommodate a couple of new line shops that will tie in with the existing mall.

Our scope includes air conditioning, ventilation and smoke extraction - designed and supervised by FLG Consulting Engineer.

We have just returned from a freezer room installation at the luxury Gmundner Lodge to the east of Windhoek and the resu...
12/06/2025

We have just returned from a freezer room installation at the luxury Gmundner Lodge to the east of Windhoek and the results are outstanding.

This had not been a straight forward installation by any means. The client could only provide us with single phase electricity, but the freezer room unit required three phase electricity as the client requested 600kg of meat to be pulled down to -20° in 48 hours. After a few calls, the highly capable team of TruTec took on the challenge and started building a custom-made, single to 3-phase converter board utilising transformers, rectifiers, capacitors and VSD’s.

Our team then got to work to have our controls added to the board to power the massive DynaBase condensing and 400mm blower coils, both supplied by Metraclark.

In addition, the client further requested us to install stainless steel shelving on his behalf. Build and supplied by Starke Manufacturing and Airconditioning cc, the shelves (1000x500/1500mm high) were added – giving the client ample space for storage.

Many thanks to the client for putting their trust in us. A big thank you also to our team, who worked tirelessly to get the freezer room set-up and running.

Total room size: 5000x4000x2500 - supplied by our trusted partners from Yeti Cool Panels.

Towards the end of last and beginning of this year we were tasked with two tricky revamps in Windhoek.Starting off with ...
14/03/2025

Towards the end of last and beginning of this year we were tasked with two tricky revamps in Windhoek.

Starting off with the headquarters of car rental giants Asco Car Hire, the client instructed us to replace an old existing evap cooler installation with DX units. For the open plan office area, we opted for Daikin’s trusted Sky Air Series, installing five 10kW inverter ceilings cassettes, which blended in perfectly with the existing ceiling services – as is depicted in the pictures.
For the smaller offices, we decided to go with Daikin’s new GTHT high wall range in various capacities.

Moving on, we replaced seven exiting Gree split units at Nashua Namibia. Through the installation of four 7.1kW ceiling cassettes and three 14kW one-way cassette units, a new breath of fresh – and cold – air now blows through the offices.

We want to take the opportunity to thank Asco Car Hire and Nashua Namibia for placing their trust in us and we’d further like to thank our suppliers Starke Manufacturing and Airconditioning cc and Cold Air Technologies for the ever so smooth process of getting the material to us in time.

We are excited to announce that we have successfully completed the 4@Steps office development in Windhoek recently.The d...
03/12/2024

We are excited to announce that we have successfully completed the 4@Steps office development in Windhoek recently.

The development was sub-divided into two 5-storey office buildings, constructed simultaneously by Nexus Group of Companies. While the west tower is occupied by the medical aid company Medsheme, the east tower remains a gray box until a tenant or owner is found.

Our scope included the installation of nine Samsung VRF/DVM units, powering a total of 62 indoor units of various capacities.

Furthermore, we installed four dedicated Samsung split units for the server rooms that run on duty-standby basis.

Fresh air is supplied via a main duct run that passes through the entire building vertically, branching off on each floor to ensure a constant and sufficient supply of fresh air.

All bathrooms are fitted with extraction system.

A special installation came in the form of two staircase pressurization fans, that ensure the staircases remain pressurized at 50 pascal in order to create a safe fire escape for the occupants, should this ever happen.

A big thank you goes out to Element Consulting Engineers for their design and guidance throughout the project.

Many thanks also to our suppliers Furtech Solutions and Starke Starke Manufacturing and Airconditioning cc for their timely delivery.

It gives us great pride to announce, that we have received our practical completion certificate for the new CYMOT Hillto...
19/09/2024

It gives us great pride to announce, that we have received our practical completion certificate for the new CYMOT Hilltop building in Windhoek – the long and hard hours have paid off.

For the last 10 months, our team was tasked with the installation and commissioning of the following:

✅ 7 x Alliance V6 Midea 56kW ducted units. These are installed in the main trading area, the heart of this stunning building. The size and height, at which the installation had to take place, has surely been one of the trickiest and demanding set-ups we have ever had the pleasure of doing. Units are designed to provide an substantial amount of fresh air to the building, which from there is partially moved to the office areas by means of smaller extraction systems.
✅ 3 x Daikin VRV4 heat recovery systems that power a total of 30 indoor units, installed all across the building. The Daikin units are mainly responsible to regulate the temperatures for the offices. Above include a iTouch Manager for the best optimal control experience.
✅ 5 x Dunham-Bush under-ceiling split units with specialized duty stand-by controls and emergency extraction systems.
✅ 8 x Daikin split units of various capacities.
✅ Si (insulated) panels installed ceilings for the 1st floor main board room as well as the complete Suricate 1st floor office block.
✅ Custom build Si panel door for the basement bulk store
✅ 13 x RVI roof vents and custom-made smoke barriers.
✅ 18 AMS smoke extraction fans split into 3 zones. Each of these fan “clusters” consist of 6 fans with 3 of them running on duty basis via VSD’s, used for ventilation inside the basement area. Once a fire alarm is triggered, all 6 fans start to run at 100% capacity to extract any smoke build up inside these areas.
✅ A multitude of bathroom extraction systems.

Our gratitude goes out CYMOT for entrusting us with these installation and for the continued support throughout this project. We especially want to thank Mr. Axel Theissen, who assisted us wherever possible. We sincerely wish your new flagship shop all the best for the future.

Thank you also the ever so professional and dedicated engineering team from SCE Consulting Engineers. Without your supervision and know-how, this project would not have been possible.

Many thanks also to the main contractor, Namibia Construction, who have again gone out of their way to assist where needed.

Last, but definitely not least, a big thank you to our suppliers
- Starke Manufacturing and Airconditioning cc
- Furntech Fourways Solutions
- Styrotex - Global Polymer Industries

Address

Nickel Street 30
Windhoek

Opening Hours

Monday 07:00 - 17:00
Tuesday 07:00 - 17:00
Wednesday 07:00 - 17:00
Thursday 07:00 - 17:00
Friday 07:00 - 17:00

Alerts

Be the first to know and let us send you an email when Saager Aircool CC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share