Ammah Group Ltd

Ammah Group Ltd We offer an array of professional services ranging from Construction, Engineering and Real Estate.

18/04/2026

🚧 Watch This Space… 🚧

Something remarkable is taking shape at Ammah Group Limited.

From concept to construction, we’re building more than structures… We’re building impact. Stay tuned as we unveil what’s next.

The journey is just getting started.

StayTuned…..

STRUCTURAL PROGRESS UPDATEOngoing works at the Maimalari Military Cantonment project include the curing of recently cast...
10/04/2026

STRUCTURAL PROGRESS UPDATE

Ongoing works at the Maimalari Military Cantonment project include the curing of recently cast slabs to ensure proper strength development and long-term durability. Controlled curing methods are maintained to prevent surface cracking and support optimal concrete performance.

Blockwork for the first floor is also in progress, with careful attention to alignment, bonding and level accuracy to maintain structural consistency across all units.

In addition, mechanical and electrical piping installations are being integrated within the first-floor framework, ensuring coordinated service routing prior to subsequent structural activities. Reinforcement works for the continuous columns are equally underway, guaranteeing proper load transfer from upper levels to the foundation.

Each activity is executed in line with approved structural drawings and engineering standards.

📍PROJECT – Maimalari Military Cantonment, Maiduguri
Construction of the 4x30 Family CBQs.

🚧 PROJECT PROGRESS – JIGAWA 🚧📍26 Brigade Barracks, DutseConstruction is advancing steadily on the One (1) x 2-Bedroom 30...
10/04/2026

🚧 PROJECT PROGRESS – JIGAWA 🚧
📍26 Brigade Barracks, Dutse

Construction is advancing steadily on the One (1) x 2-Bedroom 30 Family Corporal and Below Quarters project.

Following the excavation of foundation and pit trenches, concrete blinding was carried out to provide a clean and level base for structural works. Reinforcement was then carefully fixed in accordance with approved structural specifications. This was subsequently followed by the casting of foundation concrete and column bases, forming the primary load-bearing components of the structure.

Each stage from excavation to blinding, reinforcement placement and concrete casting has been executed in strict compliance with engineering standards to ensure durability, strength and long-term performance.

We continue to make measurable progress as the project advances to the next phase.

JigawaProject AmmahGroupLimited BuildingWithExcellence

PROJECT UPDATE 🚧Construction of One (1) x 2-Bedroom 30 Family Corporal and Below Quarters📍 26 Brigade Barracks, Dutse, J...
28/03/2026

PROJECT UPDATE đźš§

Construction of One (1) x 2-Bedroom 30 Family Corporal and Below Quarters
📍 26 Brigade Barracks, Dutse, Jigawa State

Ammah Group Limited is pleased to share progress from this residential development project.

These images capture earlier stages of the work, including site takeover, setting out, profiling and excavation of pits and trenches.. This are key preparatory phases that ensure accurate positioning and alignment of the structures before construction advances.

The project is being executed to deliver functional, durable and well-structured accommodation in line with engineering standards and specifications.

We remain committed to delivering quality with precision, professionalism and excellence.

Happy Eid El-Fitr! 🌙✨May this special day bring peace, joy and abundant blessings to you and your loved ones.Thank you f...
20/03/2026

Happy Eid El-Fitr! 🌙✨
May this special day bring peace, joy and abundant blessings to you and your loved ones.
Thank you for your continued trust and partnership.

— Ammah Group Limited

CONCRETE CASTING STAGE – SLABS, COLUMNS & BEAMSThis stage involves the placement and casting of concrete for structural ...
18/03/2026

CONCRETE CASTING STAGE – SLABS, COLUMNS & BEAMS

This stage involves the placement and casting of concrete for structural slabs, columns and beams in accordance with approved structural specifications. Prior to casting, reinforcement and formwork are thoroughly inspected to ensure proper alignment, stability and compliance with design requirements.

Concrete is carefully mixed, poured and vibrated to eliminate air voids and achieve optimal compaction, ensuring strength, durability and uniformity throughout the structural elements. Proper curing methods are then implemented to support strength development and prevent surface defects.

At Ammah Group Limited, we maintain strict quality control during casting operations, ensuring that material standards, mix proportions and workmanship meet established engineering benchmarks.

This phase solidifies the structural framework of the building, enabling safe load transfer and forming the backbone of the superstructure.

📍PROJECT – Maimalari Military Cantonment, Maiduguri
Construction of the 4x30 Family CBQs.

REINFORCEMENT, FORMWORK & MEP COORDINATION STAGEThis stage involves the detailed placement of steel reinforcement for sl...
11/03/2026

REINFORCEMENT, FORMWORK & MEP COORDINATION STAGE

This stage involves the detailed placement of steel reinforcement for slabs, beams and staircase elements in strict accordance with approved structural drawings and load requirements. Proper bar spacing, lapping, anchorage lengths and tying are carefully executed to ensure structural strength, stability and long-term performance.

Formwork installation is done to provide the necessary support and shape for concrete elements. The formwork is aligned, leveled and securely braced to maintain dimensional accuracy and surface quality during casting.

At this phase, mechanical and electrical piping are also integrated within the structural framework. Conduits, sleeves and service routes are strategically positioned before concrete placement to ensure seamless service distribution without compromising structural integrity.

At Ammah Group Limited, we prioritize precision, coordination and strict adherence to engineering standards, ensuring every structural component is executed with technical excellence.

This stage is critical in defining the structural framework of a high-rise building, laying the groundwork for safe load transfer and efficient building services integration.

📍PROJECT – Maimalari Military Cantonment, Maiduguri
Construction of the 4x30 Family CBQs.

staircaseconstruction

BLOCKWORK STAGEThis stage involves the systematic laying of sandcrete blocks in accordance with approved structural draw...
05/03/2026

BLOCKWORK STAGE

This stage involves the systematic laying of sandcrete blocks in accordance with approved structural drawings, ensuring precise alignment, correct bonding patterns and accurate leveling. Close attention is given to mortar mix proportions and joint uniformity to guarantee structural stability, strength and long-term durability.

At Ammah Group Limited, we prioritize excellence through strict quality control measures, skilled workmanship and adherence to engineering best practices at every phase of construction. Our commitment is to deliver structures that are not only functional but built to stand the test of time.

As the walls begin to take shape, the building’s layout and overall form become clearly defined, marking measurable progress within the superstructure phase.

📍PROJECT – Maimalari Military Cantonment, Maiduguri
Construction of the 4x30 Family CBQs.

BuildingWithPrecision EngineeringStandards AmmahGroupLimited

May Nigeria continue to rise in unity, peace and prosperity. Wishing our beloved nation strength, growth and endless pos...
01/10/2025

May Nigeria continue to rise in unity, peace and prosperity. Wishing our beloved nation strength, growth and endless possibilities at 65 and beyond.

Happy Independence Day from us all at Ammah Group Limited!

📍Project Progress – Substructural Works📍Maimalari Military Cantonment, MaiduguriHere’s a glimpse into the completed subs...
03/07/2025

📍Project Progress – Substructural Works
📍Maimalari Military Cantonment, Maiduguri

Here’s a glimpse into the completed substructure phase for the 4x30 Family CBQs project.

This stage involved a series of critical activities, including:
✔️ Concrete works in foundation
✔️ Ground beam casting
✔️ Reinforcement installation
✔️ Formwork preparation
✔️ DPC (Damp Proof Course) casting
✔️ Surface treatment

Each step was executed in line with structural and engineering standards to ensure a strong and durable base for the superstructure.

Steady progress continues as we build with purpose and precision.

🇳🇬 Happy Democracy Day!Today, we celebrate the power of the people, the strength of our voices and the beauty of our uni...
12/06/2025

🇳🇬 Happy Democracy Day!
Today, we celebrate the power of the people, the strength of our voices and the beauty of our unity.
May our democracy continue to grow stronger, more inclusive, and more impactful for every Nigerian.

Democracy is not just a system.. It’s our shared responsibility.
Let’s keep hope alive and build a brighter Nigeria together.

With love, From all of us at Ammah Contractors Ltd.

May the spirit of Eid bring joy, unity, and countless blessings to your home and heart. Eid al-Adha Mubarak from all of ...
06/06/2025

May the spirit of Eid bring joy, unity, and countless blessings to your home and heart. Eid al-Adha Mubarak from all of us at Ammah Contractors Ltd.🎉

Address

NO23A, Rabah Road, Malali
Kaduna
800242

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00

Telephone

+2349036361673

Website

Alerts

Be the first to know and let us send you an email when Ammah Group Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ammah Group Ltd:

Share