Ik.emah Ventures Limited

Ik.emah Ventures Limited Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Ik.emah Ventures Limited, Construction Company, 102 Ikot Ekpene Road, Uyo.

IK.EMAH VENTURES LIMITED is a young and dynamic outfit with first class services and we render a wide range of Civil/Building Services, Construction, Renovations and Design.

15/11/2022
FOUR BEDROOM TERRACE DUPLEX FOR SALE.AMENITIES Includes:** 4 Bedrooms ensuite with water Heater,  glass Shower cubicles,...
14/11/2022

FOUR BEDROOM TERRACE DUPLEX FOR SALE.

AMENITIES Includes:

** 4 Bedrooms ensuite with water Heater, glass Shower cubicles, and walking closet
** Fully fitted kitchen with extractor and Hood.
** CCTV
** 20KVA Generator
** Fully AC
** Separate EKEDC prepared Meter
** Water Treatment/ filtering system
** Wardrobe/ Masters walking closet
** Parking garage for 2 cars
** BQ
** Bio Gas Sewage system
** Fire Alarm/smoke detector
** Design concrete floor outside
** Self service
** General Service Charge only on Security & Lawma.

Price: 230m fixed.
Rent: 10m
Location: Oniru

For Enquiries and contact on this and other Luxury apartments call:-
08033667438

FOUR BEDROOM TERRACE DUPLEX FOR SALE.AMENITIES Includes:** 4 Bedrooms ensuite with water Heater,  glass Shower cubicles,...
14/09/2022

FOUR BEDROOM TERRACE DUPLEX FOR SALE.

AMENITIES Includes:

** 4 Bedrooms ensuite with water Heater, glass Shower cubicles, and walking closet
** Fully fitted kitchen with extractor and Hood.
** CCTV
** 20KVA Generator
** Fully AC
** Separate EKEDC prepared Meter
** Water Treatment/ filtering system
** Wardrobe/ Masters walking closet
** Parking garage for 2 cars
** BQ
** Bio Gas Sewage system
** Fire Alarm/smoke detector
** Design concrete floor outside
** No service charge, Manage it yourself
** General Service Charge only on Security & Lawma.

Price: 220m fixed.
Rent: 11m
Location: Oniru

For Enquiries and contact on this and other Luxury apartments call:- 08023381738
07059566816

SpecificationsELECTRIC SHOWER HEAD 1.Most competitive price2.Highly tested durability3. Energy saving4.5 seconds instant...
27/12/2020

Specifications

ELECTRIC SHOWER HEAD

1.Most competitive price
2.Highly tested durability
3. Energy saving
4.5 seconds instantaneous heating electric heater shower head
5. Tankless water heater
Build in water flow sensor

Box Includes:
1. Separate hose with pipe for extra water
2. Clips to mount the wire and the hose

Our shower heater is a small unit, so it obviously doesn't contain a water pump.
The water pressure of your mains is the pressure with which you will get
water from your shower head. The only purpose of the shower is to quickly heat cold water coming from the mains, while it runs through the shower and out of the shower head.

Thus, the main advantage of the electric shower is that you heat only as much water as you use, as opposed to a conventional water heater, where power is wasted heating more water than is required.
This makes the electrical water heater very
economical.

Also, with this electric shower, you are not
dependent on the conventional water heater and the time it takes to heat up water.
Another advantage that comes with purchasing such a shower is minimal plumbing.

Since you don't need to mix hot and cold water, just one pipe connected to
your cold water mains is sufficient for an electric shower.

Without waiting, it can provide continuous hot water in only 5 seconds. The actual color of the product can be confirmed by the client!

Features:
1.Electric leakage protection
2.Over pressure protection
3.Lively style

Specifications:
Circuit breaker Cable size Voltage Power rating,
30A 4mm² 220/230V 5400W
25A 4mm² 220/230V 4400W

Frequency 50/60HZ Out water
temperature 30-60°C
IP class IP 24 Grounding wire YES
Water flow 5L/min Hose and
hand shower YES

Using:
On your shower wall the shower head can be
mounted, and its height adjusted, making it very convenient to use.

The hand shower is attached to the shower head. Place the selector key in the position desired.

The water temperature can be controlled through the water value!

Depending on the cost of the shower head, you can get a variety of sprays to improve your shower experience.

They supply water at a consistent temperature which can be varied depending on user
preference.

IK.EMAH VENTURES ENTERPRISE would love your feedback. Post a review to our profile.
https://g.page/ik-emah-ventures-enterprise/review?gm

Unit price: 14,000 Naira - $38
Free Delivery

WhatsApp or Call
08023381738, 08033667438
Email: [email protected]

Installation of Precast Mortar fascia, Parapet
20/12/2020

Installation of Precast Mortar fascia, Parapet

18/11/2020

Find out more about IK.EMAH VENTURES ENTERPRISE by following them on Google

26/10/2019

Architect - Bsc
Builder - Btech
Quality control officer - Bsc in Risk management

Three types of parapet design
17/10/2017

Three types of parapet design

17/09/2017

Causes and How to avoid cracks when laying blocks.
Laying blocks without cracking requires some basic steps to watch out for. If you are careless the probability of having cracked walls will be high.
These amongst others are the causes and how to avoid them-
(1)Wrong block moulding mixture-Cement and sand mixture for sand needs to be properly checked which is usually between 1:6 to 1:8 depends on types of constituents.
Very good mixture for a 9” block will produce 30 pieces worst it should not exceed 50 on any account.
Stone dust are also added in a proportion to give a stronger block, trying to save cost by using inadequate cement, sand ratio will weaken your walls and can lead to cracks.
(2)Wrong cement mortar mixture-Mortar is what you use as the bond between one block and the other, the blocks are expected to be adequately bonded by the mortar, if this is weak it can also affect the block and can lead to cracking.
(3)Wrong laying pattern-Blocks should be set on each other in herringbone manner see diagram——


Laying the edge of one block on another causes cracking along the mortar line when is not broken by locking it up with other blocks, The vertical mortar line is the weakest point and should be broken by walls, straight line from top to bottom will cause cracking.
(4)Weak Foundation- Weak foundation causes unusual settlements and movements on foundation that will ultimately affects the block walls on top, this surely will cause cracks from foundation through the walls. Cracks could be horizontal or vertical; the horizontal requires serious structural remedy because that may be due to uneven settlements.
(5)Plumpness or straightness when laying your blocks can also adversely affect the block work especially when is terribly done.
(6)Boring holes indiscriminately-Electricians and plumbers are major culprits on site when it involves creating holes on block walls. Caution needs to be taking when creating these holes which are used as scaffolding else you will have crack walls or you can go for total free standing scaffolds.
(7)Long, successive horizontal and vertical block works without concrete breaks- laying blocks on each other with any height beyond 3.6m without a corresponding concrete break will create pressure on block walls which can also cause cracking especially when the blocks are not strong and load bearing.
(8)Wet blocks-Blocks are supposed to be left to dry and strong before usage, usually it takes minimum of 48 hours to cure, using blocks under 24 hours is not advisable and it leads to cracking.
(9)Mishandling of blocks-Proper care should be taken when blocks are in use.
(10)Impurities in mixture-When there are dirt’s in constituents, expect a weak block which will surely leads to cracking.
(11)Improper or wrong materials will not help save money but will create problems, for instance using sand gathered from drainage gutter.
(12)Loosely compacted blocks during moulding will also affect the block which will lead to cracking of block walls.
(13)Inadequate concrete support in case of load.
(14)Shrinkage-When you build on a clayey soil which contract and expand. Clay causes movement in foundation and when the foundation is shallow it will affect the block wall.
(15)Using fresh blocks
(16)Using unclean sand with clay just as stated in ‘14’,clay contracts when is dried and expand when it is wet, these movements causes cracking.
(17)Flooding-Areas susceptible to long-term flooding will also experience walls cracking, water can go underneath foundation, weaken the foundation and cause movements which will affect the block walls and leads to cracking.
(18)Differential settlements in foundation-Please check to make sure where you are building, the problems of differential settlements does not arise.
(19) unevenly compacted fill. When you fill the foundation with laterite but you didn’t ‘rammer’ or compact very well the areas with loose soil will affect the block wall on top of it and cause cracks.
(20)When one side settles on rock which can’t have any further settlement with a corresponding soil area that is required to settle, expect cracking of walls especially when the block spans across.
(21)Poorly designed structure without adequate planning of walls joining each other.
(22)When you have extremely rich mortar mix, this will also affect block and make it to crack, especially when you want to remove and place elsewhere. It causes wall stiffness, there should be room for the wall to breathe.
(23)Rapid loading of blockworks-When you have a deadline and you put too many blocks on each other you are most likely to have cracks.
(24)Removing props or construction supports too early will create tension on the blockwall which can lead to cracks
(25)When you have deciduous trees with roots growing underneath the foundation.
(26)Natural disasters like earthquakes, winds, tremor and volcanoes etc
(27)Free standing walls-This is caused by bad designs when you have too many walls not locking with other walls. The isolated walls are likely to crack
(28)Rising damp around building.
(29)Poor drainage will make water gather around building which will ultimately affect the walls.
(30)Mining activities around building will cause vibration and affects the wall which can cause cracking especially when it involves blasting of rocks etc with explosives.
(31)Very short lintel (concrete) ontop of windows, doors and other openings will affect the surrounding blocks and cause cracks.
(32) No oversite concrete or german floor.

17/09/2017

Comments


HOW TO CHECK AND CONFIRM QUALITY OF CEMENT AT SITE

Cement is one of the most important materials used in construction. The strength of a structure depends upon several factors, cement quality is one of them. To achieve the desired strength of concrete and to increase the longevity of structure good quality cement should always be used.

So it is important to check the quality of cement before using.
To check the quality of cement we need to pass some easy tests which are described below:
1. DATE OF PACKING:
The strength of cement decreases with time. First of all, check the manufacturing date in the bag before using. Generally, cement should be used before 90 days from the manufacturing date. The percentage of strength loss of cement is given in the below table.

Age of cement. %reduction of strength

"""""""""""""""". """"""""""""""""""""""""

3 months. 20-30

6 months. 30-40

12 months. 40-50

2. CEMENT COLOR:
The cement should be uniform in color. Good quality cement should have gray color with greenish shade.

3. CHECK FOR LUMPS:
No lumps should be present in the cement. Lumps are formed due to absorption of moisture from the climate.

4. RUBBING TEST:
Cement should feel smooth while rubbing in between fingers. If it gives a rough feeling that means cement is mixed with sand.

5 TEMPERATURE TEST:
Simply insert your hand into the cement bag, it should give cool feeling if its quality is good. Otherwise, you may feel warm because of hydration reaction.

6. FLOAT TEST:
Take some amount of cement and throw it in water. The cement should float for sometimes before it sinks in the water.

7. SETTING TEST:
Make a thick cement paste with water and immerse it in water for 24 hours. It should be set and should not develop cracks.

8. STRENGTH TEST:
Prepare a cement block of 25 mm x 25 mm and 200 mm in length. Now submerge it in water for 7 days. Now place it on supports 15 cm apart and load it with 34 kg weight. Block made from good cement will not show any signs of failure.
By Engr. Ukeme Opulence Okpob

Two Bedroom Semi-detached under construction
06/08/2017

Two Bedroom Semi-detached under construction

Address

102 Ikot Ekpene Road
Uyo
520321

Alerts

Be the first to know and let us send you an email when Ik.emah Ventures Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share