SDMO Kohler Rehlko Generatingsets 1 - 15000 Kva

SDMO  Kohler  Rehlko Generatingsets 1 - 15000 Kva 3e aggregaatbouwer ter wereld met voor ieder een oplossing voor zijn of haar decentrale energie opwekkings uitdaging. Power van 1 kVA tot โ™พ MW.

Power van 1 kVA tot 15 MW.

๐Ÿ‡ฌ๐Ÿ‡ง Sizing an emergency power generator is much more than adding up the connected power. Factors such as switch-on flows,...
31/07/2026

๐Ÿ‡ฌ๐Ÿ‡ง Sizing an emergency power generator is much more than adding up the connected power. Factors such as switch-on flows, UPS systems, selectivity, redundancy and future expansions play a crucial role in this. A well-dimensionalized aggregate not only ensures the maximum availability of the installation, but also contributes to minimal operational costs and prevents critical processes from being disrupted during a grid failure.
After all, in mission-critical environments, such as data centers, incorrect sizing can be more costly than the investment in the aggregate itself. Even one second outage can lead to significant financial damage, operational disruptions and reputational loss.
In addition, the so-called Power Disaster must be taken into account: the speed at which the electrical power increases or decreases. This aspect is becoming increasingly important, particularly in modern data centers where AI loads play a prominent role. AI servers behave fundamentally differently from traditional IT taxes. Where conventional server loads typically increase gradually, AI workloads can scale from 20% to 100% loads within milliseconds or seconds, for example, from 20% to 100%.
These rapid and dynamic load changes place high demands on the entire energy infrastructure. Not only the emergency power generator, but also UPS systems, transformers, switching installations and cooling systems should be able to absorb such power jumps reliably and without interruption. In the design of an emergency power supply, therefore, not only the maximum power (kW or MW) is important, but also the speed at which this power changes.
A future-proof sizing therefore requires an integral approach, taking into account the current load, the dynamic properties of modern IT environments and future expansions. Only then can the required availability of critical installations be guaranteed.

๐Ÿ‡ณ๐Ÿ‡ฑ Het dimensioneren van een noodstroomaggregaat is veel meer dan het optellen van het aangesloten vermogen. Factoren zoals inschakelstromen, UPS-systemen, selectiviteit, redundantie en toekomstige uitbreidingen spelen hierbij een cruciale rol. Een goed gedimensioneerd aggregaat waarborgt niet alleen de maximale beschikbaarheid van de installatie, maar draagt ook bij aan minimale operationele kosten en voorkomt dat kritische processen tijdens een netuitval worden verstoord.
In bedrijfskritische omgevingen, zoals datacenters, kan een onjuiste dimensionering immers kostbaarder uitpakken dan de investering in het aggregaat zelf. Zelfs รฉรฉn seconde uitval kan leiden tot aanzienlijke financiรซle schade, operationele verstoringen en reputatieverlies.
Daarnaast moet rekening worden gehouden met de zogenaamde Power Ramp: de snelheid waarmee het elektrisch vermogen toe- of afneemt. Dit aspect wordt steeds belangrijker, met name in moderne datacenters waar AI-belastingen een prominente rol spelen. AI-servers gedragen zich fundamenteel anders dan traditionele IT-belastingen. Waar conventionele serverbelastingen doorgaans geleidelijk toenemen, kunnen AI-workloads binnen milliseconden of enkele seconden van bijvoorbeeld 20% naar 100% belasting opschalen.
Deze snelle en dynamische belasting veranderingen stellen hoge eisen aan de complete energie-infrastructuur. Niet alleen het noodstroomaggregaat, maar ook UPS-systemen, transformatoren, schakelinstallaties en koelsystemen moeten in staat zijn om dergelijke vermogenssprongen betrouwbaar en zonder onderbreking op te vangen. Bij het ontwerp van een noodstroomvoorziening is daarom niet alleen het maximale vermogen (kW of MW) van belang, maar ook de snelheid waarmee dit vermogen verandert.
Een toekomstbestendige dimensionering vraagt dan ook om een integrale benadering, waarbij zowel de huidige belasting, de dynamische eigenschappen van moderne IT-omgevingen als toekomstige uitbreidingen worden meegenomen. Alleen dan kan de vereiste beschikbaarheid van kritische installaties worden gegarandeerd.

Phase 1 of a major Data Centre project in Germany has now been successfully completed by Wiltech Acoustics Ltd, now part...
08/07/2026

Phase 1 of a major Data Centre project in Germany has now been successfully completed by Wiltech Acoustics Ltd, now part of Rehlko - Kohler - SDMO, with the first 16 acoustic canopies installed on site.

This marks a strong start to the wider program, which will see 128 bespoke units delivered across eight phases to support critical infrastructure.

Phase 2 is now progressing, with the next 16 canopies moving through final build stages ahead of installation.

A great milestone for all involved, and a strong example of how Rehlko brings together specialist expertise to deliver end to end solutions for the Data Centre sector.

๐—ฅ๐—ฒ๐—ต๐—น๐—ธ๐—ผ ๐—”๐— ๐—ฃ๐Ÿด๐Ÿฌ๐Ÿฎ ๐—–๐—ผ๐—ป๐˜๐—ฟ๐—ผ๐—น๐—น๐—ฒ๐—ฟ ๐—ง๐—ฟ๐—ฎ๐—ถ๐—ป๐—ถ๐—ป๐—ดAls officieel Rehlko | Power Systems Training Center verzorgen wij Rehlko producttraini...
06/07/2026

๐—ฅ๐—ฒ๐—ต๐—น๐—ธ๐—ผ ๐—”๐— ๐—ฃ๐Ÿด๐Ÿฌ๐Ÿฎ ๐—–๐—ผ๐—ป๐˜๐—ฟ๐—ผ๐—น๐—น๐—ฒ๐—ฟ ๐—ง๐—ฟ๐—ฎ๐—ถ๐—ป๐—ถ๐—ป๐—ด

Als officieel Rehlko | Power Systems Training Center verzorgen wij Rehlko producttrainingen aan Rehlko distributeurs uit verschillende regio's. Afgelopen week gaven wij de APM802 controller training aan distributeurs uit onder andere Noorwegen, Ierland en Angola.

De APM802 is een geavanceerde generatorset controller van Rehlko. Tijdens de training leren deelnemers onder andere:
๐Ÿ”ต De mogelijkheden en functies van de controllers
๐Ÿ”ต Het beheren van parallel- en eilandbedrijf
๐Ÿ”ต Het synchroniseren van meerdere generatoren
๐Ÿ”ต Hoe je proefdraaien uitvoert
๐Ÿ”ต Het uitvoeren van updates

---------------------------------------

As an official Rehlko Training Center, we provide Rehlko product training to distributors from various regions around the region. Last week, we delivered an APM802 controller training to distributors from, among others, Norway, Ireland, and Angola.

The APM802 is an advanced generator set controller from Rehlko. During the training, participants learn about:
๐Ÿ”ต The capabilities and functions of the controller
๐Ÿ”ต Managing parallel and island mode operation
๐Ÿ”ต Synchronizing multiple generators
๐Ÿ”ต Performing generator set test runs
๐Ÿ”ต Carrying out software and firmware updates

MEP d.o.o. POWERBRIDGE spol. s r.o. PM ENERGI A/S Energolukss MLS Exing d.o.o. Satema AS Best Tools Company Coromatic AB DEMTECH AG Rehlko | Power Systems UK

๐Ÿฅ โšกNieuw noodstroomaggregaat voor uitbreiding zorginstellingVoor een psychiatrische zorginstelling stond een uitbreiding...
17/06/2026

๐Ÿฅ โšกNieuw noodstroomaggregaat voor uitbreiding zorginstelling

Voor een psychiatrische zorginstelling stond een uitbreiding van de bestaande noodstroomvoorziening gepland. Omdat het huidige aggregaat inmiddels op leeftijd was, is uiteindelijk gekozen voor een compleet nieuw, groter 1400 kVA Rehlko | Power Systems noodstroomaggregaat. Voor de gehele installatie verzorgden wij ook de engineering van het besturings-, brandstof-, ventilatie- en uitlaatsysteem:

๐Ÿ”ต Besturingsysteem is uitgevoerd voor netovername en langdurig parallelbedrijf.
๐Ÿ”ต Ventilatie- en uitlaatsysteem is zo ontworpen, dat het voldoet aan strenge, gestelde geluidseisen.
๐Ÿ”ต Brandstofvoorziening bestaat uit een 500 liter dagtank, die door een redundant uitgevoerde pompset automatisch op niveau wordt gehouden vanuit een ondergrondse brandstoftank van 5.000 liter
๐Ÿ”ต Factory Acceptance Test (FAT) uitgevoerd in aanwezigheid van de klant, waarbij de volledige configuratie van de installatie is getest

Inmiddels is het aggregaat naar de projectlocatie vervoerd en daar succesvol geplaatst en inbedrijfgesteld! ๐Ÿ‘



๐Ÿฅ โšกNew emergency power generator for expansion healthcare institution

For a psychiatric care facility, an extension of the existing emergency power supply was planned. Because the current generator was now at an age, a completely new, larger, larger 1400 kVA Rehlko | Power Systems emergency power generator was ultimately chosen. For the entire installation, we also took care of the engineering of the control, fuel, ventilation and exhaust system:

๐Ÿ”ต Control system is equipped for network takeover and long-term parallel operation.
๐Ÿ”ต Ventilation and exhaust system is designed in such a way that it meets strict, sound requirements.
๐Ÿ”ต Fuel supply consists of a 500 liter day tank, which is automatically kept on level by a redundant pump set from an underground fuel tank of 5,000 liters
๐Ÿ”ต Factory Acceptance Test (FAT) performed in customer presence, testing the entire configuration of the installation

In the meantime, the aggregate has been transported to the project location and successfully placed and commissioned there! ๐Ÿ‘

Once again  a  SDMO - Kohler - Rehlko genset for Switch Datacenters.
16/04/2026

Once again a SDMO - Kohler - Rehlko genset for Switch Datacenters.

โšก๐Ÿข๐๐ž๐ฌ๐ฉ๐จ๐ค๐ž ๐ž๐ฆ๐ž๐ซ๐ ๐ž๐ง๐œ๐ฒ ๐›๐š๐œ๐ค๐ฎ๐ฉ ๐ฉ๐จ๐ฐ๐ž๐ซ ๐ฌ๐จ๐ฅ๐ฎ๐ญ๐ข๐จ๐ง ๐Ÿ๐จ๐ซ ๐š ๐๐š๐ญ๐š๐œ๐ž๐ง๐ญ๐ž๐ซ For a major datacenter project in Germany, we ; KVT Germany, ...
14/04/2026

โšก๐Ÿข๐๐ž๐ฌ๐ฉ๐จ๐ค๐ž ๐ž๐ฆ๐ž๐ซ๐ ๐ž๐ง๐œ๐ฒ ๐›๐š๐œ๐ค๐ฎ๐ฉ ๐ฉ๐จ๐ฐ๐ž๐ซ ๐ฌ๐จ๐ฅ๐ฎ๐ญ๐ข๐จ๐ง ๐Ÿ๐จ๐ซ ๐š ๐๐š๐ญ๐š๐œ๐ž๐ง๐ญ๐ž๐ซ

For a major datacenter project in Germany, we ; KVT Germany, are delivering, installing, and commissioning a large number of bespoke 3500 kVA genset solutions, integrated in a 45 ft sound-attenuated canopy. Recently, the first unit was officially approved by the customer during the Factory Witness Test (FWT) at our facility. During this test phase, and in the presence of the customer, it was confirmed that the installation meets all technical and operational requirements.

The units are powered by Rehlko - SDMO KD3500-E generator sets and include, among other features:
๐Ÿ”ตSwitchboard with 5000 Amp circuit breakers
๐Ÿ”ตGrid-compliant control system
๐Ÿ”ต Water mist-based fire detection and suppression system
๐Ÿ”ตSCR aftertreatment system compliant with the latest environmental requirements
๐Ÿ”ตDry cooler with variable-speed fans
๐Ÿ”ต30,000-liter belly tank with double-walled filling line and fuel polishers
๐Ÿ”ตNoise level below 75 dB(A) at a distance of 1 meter

In the next phase, the remaining units will be assembled and prepared for delivery and on-site installation.
A project our teams are proud to be working on. ๐Ÿ’ช

The newly branded Rehlko | Power Systems generators are on the road - looking sharp in that bold new shade.As the Rehlko...
10/03/2026

The newly branded Rehlko | Power Systems generators are on the road - looking sharp in that bold new shade.

As the Rehlko Authorized Distributor for the Rocky Mountains and Pacific Northwest, Power Systems West is proud to deliver the next chapter of reliable backup power across the region... no matter the forecast. โšก ๐Ÿš›

10/03/2026

60 years SDMO / Kohler / Rehlko

Adres

Hippolytushoef
1777ZG

Website

Meldingen

Wees de eerste die het weet en laat ons u een e-mail sturen wanneer SDMO Kohler Rehlko Generatingsets 1 - 15000 Kva nieuws en promoties plaatst. Uw e-mailadres wordt niet voor andere doeleinden gebruikt en u kunt zich op elk gewenst moment afmelden.

Snelkoppelingen

Delen