04/08/2026
One new Bathroom full renovation
from revving.
Making wood construction,
montering glava isolation,
monter. ropanels,
Litex waterproof system whit Alu-band connections,
smøring the mansjettes ourand the pipes and areas,
tileing 60/60cm tiles to the walls and to the floor,
montering visitation hidden door whit insert tile, to make acces to the water pipe distribution box,
fixing fugemasse,
silikonfugging .
Repared the fall of the floor, whit rapid spakler masse,
adding Sweis membran isolation,
fixed B20 betong stopemorter whit armering netz and electr.heating cables,
montering smørmembran whit slukk mansjett in shower floor like 2.protection,
fixing porcelain mosaic in shower area, whit insert slukk frame whit mosaic.
Lowering the ceiling to 2,4m hight,
adding wood lekters whit
Fischer plastic plaggs and skrued whit justering skrues,
montering gipsplates,
sparklering and painting whit waterproof sparkler and paint, akryling the connections between the paint and tiles edges.