26/06/2026
We are proud to announce that BOS Power has been awarded a major turnkey BESS contract by MOLSLINJEN.
We will deliver approximately 250 MWh of shoreside energy storage across two coastal sites, supporting the electrification of one of Denmark’s most important ferry routes: the Kattegat crossing between Jutland and Zealand.
These are not ordinary sites. Coastal, port-side locations integrated directly into the ferry charging infrastructure, across two separate locations, under a single point of EPC responsibility, from design and engineering through civil works, installation, commissioning and full grid code compliance.
Electrifying critical ferry infrastructure has to be done without compromising the reliability that passengers and communities depend on every day. That is the standard we are delivering to.
This contract brings BOS Power’s delivered and contracted BESS portfolio beyond 500 MWh across the Nordic region.
A milestone we are genuinely proud of, and one that reflects the trust our customers place in us as a full turnkey partner.
Thank you to the entire BOS Power team and to Molslinjen for placing that trust in us 🚢⚡
Read the full story here: https://lnkd.in/e-EnmK9r